Skip to main content

Production Scheduling with Quantitative and Qualitative Selection of Human Resources

  • Conference paper
  • First Online:
Trends and Advances in Information Systems and Technologies (WorldCIST'18 2018)

Part of the book series: Advances in Intelligent Systems and Computing ((AISC,volume 747))

Included in the following conference series:

Abstract

The paper presents a method of quantitative and qualitative selection of human resources in production planning based on assumed load of the production system. Human resources are treated as additional resources. Determining the required number of staff and their competences is implemented in three stages. First, the production schedule is determined with the assumption of unlimited availability of additional resources. The obtained solution is a point of reference for determining the minimum number of required resources and their competencies. In the second stage, the reference number of workers is sought. Depending on the way selected, in the last stage the process of merging or removing the competencies of individual workers is done for the optimisation of the number of workers and their individual competencies.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 129.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 169.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  1. Nicholas, J.M., Steyn, H.: Project Management for Business Engineering and Technology. Taylor & Francis, New York (2012)

    Google Scholar 

  2. Blazewicz, J., Ecker, K.H., Pesch, E., Schmidt, G., Weglarz, J.: Scheduling Computer and Manufacturing Processes. Springer, Heidelberg (2007)

    Google Scholar 

  3. Pinedo, M.L.: Scheduling. Theory, Algorithms and Systems. Springer, New York (2012)

    MATH  Google Scholar 

  4. Kalinowski, K., Grabowik, C., Paprocka, I., Kempa, W.: Production scheduling with discrete and renewable additional resources. Materials Sci. Eng. 95, 1–6 (2015)

    Article  Google Scholar 

  5. Starzyńska, B., Hamrol, A.: Excellence toolbox: decision support system for quality tools and techniques selection and application. Total Qual. Manage. Bus. Excellence 24(5–6), 577–595 (2013)

    Article  Google Scholar 

  6. Blazewicz, J., Lenstra, J.K., RinnooyKan, A.H.G.: Scheduling subject to resource constraints: classification and complexity. Discrete Appl. Math. 5(1), 11–24 (1983)

    Article  MathSciNet  MATH  Google Scholar 

  7. Fanjul-Peyro, L., Perea, F., Ruiz, R.: Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources. Eur. J. Oper. Res. 260, 482–493 (2017)

    Article  MathSciNet  Google Scholar 

  8. Edi, E.B., Oguz, C., Ozkarahan, I.: Parallel machine scheduling with additional resources: notation, classification, models and solution methods. Eur. J. Oper. Res. 230, 449–463 (2013)

    Article  MathSciNet  MATH  Google Scholar 

  9. Baron-Puda, M., Mleczko, J.: Simulation of human resources allocation in scheduling processes. Appl. Comput. Sci. 4(2), 1–16 (2008)

    Google Scholar 

  10. Starzynska, B., Szajkowska, K., Diering, M., Rocha, A., Reis, L.P.: A study of raters agreement in quality inspection with the participation of hearing disabled employees. In: Advances in Manufacturing. LNME, pp. 881–888. Springer, Cham (2018)

    Google Scholar 

  11. Donyina, A., Heckel, R.: Modelling flexible human resource allocation by stochastic graph transformation. Electron. Commun. EASST 38, 1–17 (2010)

    Google Scholar 

  12. Dean, B.V., Denzler, D.R., Watkins, J.J.: Multiproject staff scheduling with variable resource constraints. IEEE Trans. Eng. Manage. 39(1), 59–72 (1992)

    Article  Google Scholar 

  13. Blochliger, I.: Modeling staff scheduling problems. A tutorial. Eur. J. Oper. Res. 158, 533–542 (2004)

    Article  MathSciNet  MATH  Google Scholar 

  14. Armstrong, M.: A Handbook of Human Resource Management Practice, 11th edn. Kogan Page, London (2009)

    Google Scholar 

  15. Van den Bergh, J., Jeroen Beliën, J., De Bruecker, P., Demeulemeester, E., De Boeck, L.: Personnel scheduling: a literature review. Eur. J. Oper. Res. 226, 367–385 (2013)

    Article  MathSciNet  MATH  Google Scholar 

  16. Reddy, M.S., Ratnam, C., Agrawal, R., Varela, M.L.R., Sharma, I., Manupati, V.K.: Investigation of reconfiguration effect on makespan with social network method for flexible job shop scheduling problem. Comput. Ind. Eng. 110, 231–241 (2017)

    Article  Google Scholar 

  17. Trojanowska, J., Dostatni, E.: Application of the theory of constraints for project management. Manage. Prod. Eng. Rev. 8(3), 87–95 (2017)

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Krzysztof Kalinowski .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG, part of Springer Nature

About this paper

Check for updates. Verify currency and authenticity via CrossMark

Cite this paper

Kalinowski, K., Balon, B. (2018). Production Scheduling with Quantitative and Qualitative Selection of Human Resources. In: Rocha, Á., Adeli, H., Reis, L., Costanzo, S. (eds) Trends and Advances in Information Systems and Technologies. WorldCIST'18 2018. Advances in Intelligent Systems and Computing, vol 747. Springer, Cham. https://doi.org/10.1007/978-3-319-77700-9_25

Download citation

  • DOI: https://doi.org/10.1007/978-3-319-77700-9_25

  • Published:

  • Publisher Name: Springer, Cham

  • Print ISBN: 978-3-319-77699-6

  • Online ISBN: 978-3-319-77700-9

  • eBook Packages: EngineeringEngineering (R0)

Publish with us

Policies and ethics