Skip to main content

Revisiting Tohoku’s 5-Year Recovery: Community Rebuilding Policies, Programs and Implementation

  • Chapter
  • First Online:
The 2011 Japan Earthquake and Tsunami: Reconstruction and Restoration

Part of the book series: Advances in Natural and Technological Hazards Research ((NTHR,volume 47))

Abstract

With time, details of the rebuilding efforts in the Tohoku region of Japan are fading even though reconstruction is still underway. To document and analyze rebuilding efforts, this chapter longitudinally reviews 5 years of Tohoku recovery after the Great East Japan Earthquake (GEJE) with an emphasis on community rebuilding strategies, programs and their implementation status. This chapter focuses on two topics: first, the rationales for recovery planning and the coordinated reconstruction approaches at national, prefectural, and local government levels; second, the use of community rebuilding programs by local governments. Authors initiated Tohoku rebuilding research soon after the March 2011 disaster occurred, and sets of analysis in this chapter are based on numerous formal interviews and unofficial conversations held in the affected localities as well as with national and prefectural government officials. Additionally, publicly available information and data from the Reconstruction Agency were used to analyze the community rebuilding programs. Revisiting Tohoku’s 5-year recovery shows that the national, prefectural, and local governments have developed rebuilding concepts and ideas, established institutions and programs to proceed with reconstruction, and made various implementation decisions to rebuild Tohoku stronger against future tsunamis. In particular, local governments have continuously been leading for the past 5 years to decide land use policies and adopt programs for stronger and safer community reconstruction. Analysis indicates that the number of districts using community rebuilding programs totals over 860, which explains why the Tohoku reconstruction itself is such a great challenge. Even with this challenge, however, we also found that local governments have extended their efforts to use community rebuilding programs in ways that best suit each of their recovery needs.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 109.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 139.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 199.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Act on Establishment of Reconstruction Agency, no 125 (2011)

    Google Scholar 

  • Bill on East Japan Earthquake Basic Recovery Act, no 13 (2011)

    Google Scholar 

  • Cabinet Office. About areas difficult to return, no. 35. (Committee for supporting livelihood of nuclear power plant accident victims 2013)

    Google Scholar 

  • Central Disaster Prevention Council, Technical Investigation Committee (2011) Report by special study group on Tohoku region off the pacific earthquake and tsunami measures. Central Disaster Prevention Council, Tokyo

    Google Scholar 

  • East Japan Earthquake Recovery Framework Committee (2011) Towards reconstruction: hope beyond the disaster. Cabinet Office of Japan, Tokyo

    Google Scholar 

  • EERI/ISSS (2011) The March 11, 2011, Great East Japan Earthquake and tsunami: societal dimensions. EERI, Oakland

    Google Scholar 

  • Fukushima Prefecture (2013) Records and recovering steps from the Great East Japan Earthquake. Fukushima Prefecture, Fukushima

    Google Scholar 

  • Iuchi K, Johnson LA, Olshansky RB (2013) Securing Tohoku’s future: planning for rebuilding in the first year following the Tohoku-oki earthquake and tsunami. Earthq Spectra 29(S1):S479–S499

    Article  Google Scholar 

  • Iuchi K, Maly E, Johnson LA (2015) Three years after a mega-disaster: recovery policies, programs, and implementation after the Great East Japan Earthquake. In: Santiago-Gandino V, Kontar YA, Kaneda Y (eds) Post-tsunami hazard reconstruction and restoration. Springer, London, pp 29–45

    Google Scholar 

  • Kahoku Newspaper (2011, November 11) Miyagi prefecture raises building moratoria today – transiting to new restrain for recovery. Kahoku Newspaper, Retrieved from http://www.kahoku.co.jp/spe/spe_sys1071/20111110_01.htm

  • Ministry of Land, Infrastructure, Transport and Tourism (2012a) Implementing urban development projects in GEJE affected areas (guidance). MLIT, Tokyo

    Google Scholar 

  • Ministry of Land, Infrastructure, Transport and Tourism (2012b) Study on assessing recovery procedure for tsunami affected urban areas. Ministry of Land, Infrastructure, Transport and Tourism, Tokyo

    Google Scholar 

  • Reconstruction Agency (2011) Document on act for special recovery districts from the Great East Japan Earthquake. Reconstruction Agency, Tokyo

    Google Scholar 

  • Reconstruction Agency (2015a) Program on strengthening disaster risk management functions for fishing community. Reconstruction Agency, Tokyo

    Google Scholar 

  • Reconstruction Agency (2015b) Summary on recovery focused phase and the way how recovery projects should proceed beyond 2016. Retrieved Sept 13, 2016, from http://www.reconstruction.go.jp/topics/20150602160747.html

  • Reconstruction Agency (2016a) Basic strategy on reconstruction from the Great East Japan Earthquake for the recovery-recreation phase. Retrieved September 20, 2016, from http://www.reconstruction.go.jp/topics/main-cat12/sub-cat12-1/20160311_kihonhoushin.pdf

  • Reconstruction Agency (2016b) Number of nationally evacuated population. Retrieved August 20, 2016, from http://www.reconstruction.go.jp/topics/main-cat2/sub-cat2-1/20160729_hinansha.pdf

  • Reconstruction Agency (2016c) Situation of the recovery and current efforts from Great East Japan Earthquake. Reconstruction Agency, Tokyo

    Google Scholar 

  • Reconstruction Agency (2016d) Statuses on submission, distribution and progress on reconstruction grants program plan. Retrieved September 12, 2016, from http://www.reconstruction.go.jp/topics/post_91.html

  • Reconstruction Design Council (2011) Towards reconstruction, “hope beyond the disaster”. Tokyo: Retrieved from http://www.mofa.go.jp/announce/jfpu/2011/7/pdfs/0712.pdf

  • Ubaura M (2011) Land use regulation and the great east japan earthquake. Toshi Keikaku 285:62–65

    Google Scholar 

Download references

Acknowledgement and Disclaimer

This work was supported by JSPS Grants-in Aid Grant Number 16H03586. The Authors appreciate all those who shared their knowledge and wisdom in interviews to help prepare this chapter. The authors take sole responsibility for any inaccuracies and omissions.

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Kanako Iuchi .

Editor information

Editors and Affiliations

Rights and permissions

Reprints and permissions

Copyright information

© 2018 Springer International Publishing AG

About this chapter

Cite this chapter

Iuchi, K., Olshansky, R. (2018). Revisiting Tohoku’s 5-Year Recovery: Community Rebuilding Policies, Programs and Implementation. In: Santiago-Fandiño, V., Sato, S., Maki, N., Iuchi, K. (eds) The 2011 Japan Earthquake and Tsunami: Reconstruction and Restoration. Advances in Natural and Technological Hazards Research, vol 47. Springer, Cham. https://doi.org/10.1007/978-3-319-58691-5_6

Download citation

Publish with us

Policies and ethics