The main objective of this research was to determine the impact of the proposed improvement of the mining cycle on the productivity of a mining company in the La Libertad Region during 2020. The study was carried out considering the protocols established in the Covid-19 pandemic. In the first section, the problems of this industrial sector were highlighted, as well as the causes that led to low productivity in the mining cycle of the company. In the second section, the research methodology was reflected and engineering tools such as time study, management indicators system, and COLPA were applied. In the third section, the results obtained after the proposal of the engineering tools were shown, these results were positive for the company since a benefit was obtained/cost of S/136.54, which generated an economic saving for the company of S/1 694 591. In addition, productivity in the mining cycle increased from 0.172 Ozs. Au/worker-day to 0.250 Ozs. Au/worker-day. Finally, the results obtained were compared, showing that the improvement proposal increased productivity in the mining company. The contributions in this study will serve for future research related to these variables and the industrial sector.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Similar content being viewed by others
References
Aydin, H., Tilton, J.E.: Mineral endowment, labor productivity, and comparative advantage in mining. Resour. Energy Econ. 22(4), 281–293 (2000)
Metodología para la optimización de parámetros de perforación a partir de propiedades geomecánicas | Revista Fuentes, el reventón energético. In: Revistas.uis.edu.co. (2021). https://revistas.uis.edu.co/index.php/revistafuentes/article/view/3325. Accessed 13 Dec 2021
Zhong, R.Y., Huang, G.Q., Dai, Q.: Mining standard operation times for real-time advanced production planning and scheduling from RFID-enabled shopfloor data. IFAC Proc. 46(9), 1950–1955 (2013)
Rodríguez, X.A., Loureiro, M.L., Arias, C.: Measuring productivity in the extractive industries. Evidence from Spanish fluorite mining. Resour. Policy 73, 102187 (2021)
Veres, C., Marian, L., Moica, S., Al-Akel, K.: Case study concerning 5S method impact in an automotive company. Procedia Manuf. 22, 900–905 (2018)
Peral, J., Maté, A., Marco, M.: Application of data mining techniques to identify relevant key performance indicators. Comput. Stand. Interfaces 54, 76–85 (2017)
Constantino, P., Acquarone, A., Mazini, M., Robatto, O., Ponticorbo, V., Fajardo, S.: Cuatro experiencias de automatización en Metrología y su impacto en el riesgo de calidad y la eficiencia operativa. Innotec 16, 56–63 (2018)
Scielo.org.co. (2021). http://www.scielo.org.co/pdf/eg/v35n150/0123-5923-eg-35-150-38.pdf. Accessed 13 Dec 2021
Gómez, M.C., Borrastero, C.: Innovación tecnológica y desigualdad productiva y laboral en las empresas manufactureras argentinas. Rev. Desarro y Soc. 81, 211–254 (2018)
Castracani, L.: Importar el trabajo sin las personas: la racialización de la mano de obra agrícola temporal en Canadá. Theomai 38, 55–68 (2018)
Carro Paz, R., González Gómez, D.: El sistema de producción y operaciones. Cent Doc Fac Ciencias Económicas y Soc Univ Nac Mar del Plata (2012)
Cetina Sabogal, J.A., Puentes Gil, P.A.: Estudio De Métodos Y Tiempos Para La Empresa Papeles Primavera A Los Productos De Papel Regalo Y Cartulina Plana
Niebel, B., Freivalds, A.: Métodos, estándares y diseño del trabajo. Onceava ed 1 (2009)
La Libertad es la región que más oro produce, pero en febrero producción nacional cayó 25.5% interanual - Rumbo Minero. In: Rumbo Minero (2021). https://www.rumbominero.com/peru/noticias/mineria/la-libertad-es-la-region-que-mas-oro-produce-pero-en-febrero-produccion-nacional-cayo-25-5-interanual/. Accessed 13 Dec 2021
Cámara de Comercio y Producción de La Libertad. In: Camaratru.org.pe. (2021). http://camaratru.org.pe/web2/. Accessed 13 Dec 2021
Trabajo.gob.pe. (2021). https://www.trabajo.gob.pe/archivos/file/catalogo_ocupacional/PO_opvmc.pdf. Accessed 13 Dec 2021
La minería peruana: lo que sabemos y lo que aún nos falta por saber | GRADE. In: Grade.org.pe. (2021). https://www.grade.org.pe/en/publicaciones/766-la-mineria-peruana-lo-que-sabemos-y-lo-que-aun-nos-falta-por-saber/. Accessed 13 Dec 2021
2 Modulo 1 Investig Propositiva. In: calameo.com. (2021). https://pt.calameo.com/books/006239239f8a941bec906. Accessed 13 Dec 2021
Wachapa, Tapuy, F. Evaluación del desempeño laboral del personal del Gobierno Autónomo Descentralizado Municipal del cantón Mera, provincia de Pastaza, período 2017. In: Dspace.espoch.edu.ec. (2021). http://dspace.espoch.edu.ec/handle/123456789/11425. Accessed 13 Dec 2021
Vega Gil, K.A.: Incremento de productividad utilizando equipo de perforación de 16’con sistema FAM3, en unidad minera cerro lindo-Zona Alta (2017)
Castro Pérez, D.J.: Aplicación del método de estudio de tiempos para actualizar el tiempo estándar de perforación en la fase de extracción Minera Arcata (2018)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2022 The Author(s), under exclusive license to Springer Nature Switzerland AG
About this paper
Cite this paper
Riquez, R.C.C., Adrianzén, M.E.A. (2022). Proposed Improvement of the Mining Cycle to Increase Productivity in a Mining Company in La Libertad Region, 2020. In: Iano, Y., Saotome, O., Kemper Vásquez, G.L., Cotrim Pezzuto, C., Arthur, R., Gomes de Oliveira, G. (eds) Proceedings of the 7th Brazilian Technology Symposium (BTSym’21). BTSym 2021. Smart Innovation, Systems and Technologies, vol 295. Springer, Cham. https://doi.org/10.1007/978-3-031-08545-1_69
Download citation
DOI: https://doi.org/10.1007/978-3-031-08545-1_69
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-031-08544-4
Online ISBN: 978-3-031-08545-1
eBook Packages: EngineeringEngineering (R0)