Abstract
In this chapter we discuss the sensitivity of the project performance outcomes such as the total project cost to the uncertainty in work packages. We provide two approaches to this critical step for developing risk mitigation strategies, one based on calculating derivatives of the total variance with the respect to work package of interest, and the other one based on the correlation between the total cost and the work package. Further, this chapter introduces another important analysis for designing proper mitigation strategies – determining the effects of common cause events on the correlation and ultimately on the total cost.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Pearson ES, Tukey JW (1965) Approximate means and standard deviations based on distances between percentage points of frequency curves. Biometrika 52(3–4):533–546
Wilkinson L (2006) Revising the Pareto chart. Am Stat 60(4):332–334
Wright S (1921) Correlation and causation. J Agric Res 20(7):557–585
Author information
Authors and Affiliations
Rights and permissions
Copyright information
© 2020 Springer Nature Switzerland AG
About this chapter
Cite this chapter
Damnjanovic, I., Reinschmidt, K. (2020). Sensitivity and Common Cause Effects. In: Data Analytics for Engineering and Construction Project Risk Management. Risk, Systems and Decisions. Springer, Cham. https://doi.org/10.1007/978-3-030-14251-3_7
Download citation
DOI: https://doi.org/10.1007/978-3-030-14251-3_7
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-14250-6
Online ISBN: 978-3-030-14251-3
eBook Packages: EngineeringEngineering (R0)