One of the criteria used to evaluate sequencing rules is “percent of late jobs.” It refers to the number of jobs that are completed late divided by the total number of jobs completed.

See Manufacturing systems modeling using Petri nets; Sequencing rules; Simulation analysis of manufacturing and logistics systems.

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 539.00
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

Editor information

P. M. Swamidass

Rights and permissions

Reprints and permissions

Copyright information

© 2000 Kluwer Academic Publishers

About this entry

Cite this entry

(2000). PERCENT OF LATE JOBS . In: Swamidass, P.M. (eds) Encyclopedia of Production and Manufacturing Management. Springer, Boston, MA . https://doi.org/10.1007/1-4020-0612-8_675

Download citation

  • DOI: https://doi.org/10.1007/1-4020-0612-8_675

  • Publisher Name: Springer, Boston, MA

  • Print ISBN: 978-0-7923-8630-8

  • Online ISBN: 978-1-4020-0612-8

  • eBook Packages: Springer Book Archive

Publish with us

Policies and ethics