Year 2005,continuous measurements, every 15-30 minutes, were made of stage, water temperature, conductivity in a small headwater stream, Bear Meadow Brook , Cedar Swamp, Reading MA, draining a mainly wetland catchment (49% wetland + 36% wetland). Discharge is determined from stage using discharge vs stage regressions.