Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published February 6, 2017 | Version v1
Software Open

Start-up Costs of Thermal Power Plants in Markets with Increasing Shares of Variable Renewable Generation

  • 1. DIW Berlin

Description

This is the GAMS model code and all input data required for replicating the calculations presented in the article "Start-up Costs of Thermal Power Plants in Markets with Increasing Shares of Variable Renewable Generation", which appeared in Nature Energy on 3 April 2017, Volume 2, Article Number 17050, http://dx.doi.org/10.1038/nenergy.2017.50.

Running the model requires a GAMS license and a license for a MIP solver (we use CPLEX).

I'm happy to receive any kind of feedback under wschill@diw.de.

Files

gdx_files.zip

Files (3.4 MB)

Name Size Download all
md5:e383404b7d0eec3987baa859b042a06d
2.2 MB Preview Download
md5:354c1940415a4c916020ff38cd6c29fc
1.1 kB Preview Download
md5:9340d102d968e731412e854d06180a51
74.6 kB Download
md5:ae5b5c981e9381a6dbefc0b96c6c18b6
1.2 MB Download