Published June 10, 2018 | Version v1
Conference paper Open

Technical Solutions for Increasing PV Penetration in Distribution Grids in the Czech Republic in Terms of Interflex project

  • 1. ČEZ Distribuce, a.s.

Description

The paper describes proposed, implemented, tested and verified technical solutions supporting PV integration in the distribution grids. The solutions are implemented by ČEZ Distribuce, the largest DIstribution System Operator (DSO) in the Czech Republic, in terms of Horizon 2020 InterFlex project. New approaches for PV inverters control are introduced in a way that PV integration is less limited by voltage constraints or other grid issues. Different approaches for LV and MV grinds are explained. Smart solutions including autonomous functions of PV inverters, remote control or energy storage are presented to show the future potential for successful PV grid integration.

Files

WCPEC-Interflex-v5-fullpaper.pdf

Files (1.3 MB)

Name Size Download all
md5:7ba49d14e5b5349c57d9dcb50b08842c
1.3 MB Preview Download

Additional details

Funding

InterFlex – Interactions between automated energy systems and Flexibilities brought by energy market players 731289
European Commission