Published December 15, 2017 | Version 1.0.0
Project deliverable Open

D 1.4 Preparatory Actions Report

Contributors

Data collector:

  • 1. Fundación Deusto

Description

This deliverable will present the overall progress of the pilots during the Preparatory Actions summarizing the actions taken as well as the progress made in every pilot with respect to the baseline. In particular, this report will contain:

  • A description of the sensors that have been deployed at every pilot site and their location and the
  • state of the technologies to be deployed at the pilot sites
  • A summary of the social actions carried out and their results
  • A review in terms of the KPIs and the project baseline following the sustainability model defined in D1.3

Pilots execution progress will be analysed along the project by 4 deliverables corresponding to the milestones of the project.

Milestone           Month                 Deliverable
M2                         18                     D1.4 Preparatory Actions Report
M3                         28                     D1.5 Deployment & Integration Report
M4                         34                     D1.6 Preliminary Test Report
M5                         40                     D1.7 Full Test Report

Although the baseline of the pilots is stablished in D1.3, its updates (if necessary) will be incorporated in the progress reports, as well as any modification in the KPIs methodology defined also in D1.3. 

As a result of the assessment of the project progress, each deliverable will also incorporate: the lessons learnt, the updated calendars and recommendations for the coming period (or postproject period in case of D1.7).

Files

D1.4_nov18.pdf

Files (20.8 MB)

Name Size Download all
md5:2a3c3cba996989aa1a33432456c19122
16.6 MB Preview Download
md5:d6ac7efb6017b890acfa987f7abdc97f
741.0 kB Preview Download
md5:7d379d775f51ddfb4fdb74ca44478bcc
3.0 MB Download
md5:1e0bbacb55c60115f67c73bb2d997bfc
392.6 kB Download

Additional details

Funding

Waste4Think – Moving towards Life Cycle Thinking by integrating Advanced Waste Management Systems 688995
European Commission