Long-Term Multi-Objective Optimization Dispatch and its Evaluation in Wind Integrated Power Systems

Article Preview

Abstract:

With energy saving and emission reduction paid more and more attention in electric power industry, long-term optimization dispatch in wind-integrated power system must take into consideration many inconsistent factors. In this paper on the basis of comprehensive consideration of coal consumption, emissions, openness and impartiality, a long-term multi-objective fuzzy optimization dispatch model is established. The model can optimize jointly generation maintenance scheduling, unit commitment and power output. After piecewise linearization of the objectives and the constraints, the optimization model is converted to a mixed integer linear programming (MILP) problem. An efficient optimization software CPLEX is employed to solve the problem. In order to analyze and compare different generation scheduling, a series of indices and fuzzy comprehensive evaluation method are utilized to evaluate the optimal results obtained. The proposed model is tested in IEEE 118-bus system incorporating three wind farms. The results show that the optimization model and the evaluation system built are effective and feasible.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 732-733)

Pages:

1033-1037

Citation:

Online since:

August 2013

Export:

Price:

[1] Zhenglin Yang,Guoqing Tang. Power System Technology,2011,35(2):132-136(In Chinese).

Google Scholar

[2] Guangyu He,Zuyi Li,Kun Deng,et al. Automation of Electric Power Systems, 1999, 23(16):31-34(In Chinese).

Google Scholar

[3] Xiaolin Ge,Jun Shu,Lizi Zhang. Proceeding of the CSEE,2012,32(13):36-43(In Chinese).

Google Scholar

[4] Jikeng Lin, Tongfei Li, Ziming Zhao,et al. Power System Technology,2012,36 (2): 115-120(In Chinese).

Google Scholar

[5] Jun Xiao, Chengshan Wang, Min Zhou. Power System Technology, 2004, 24(4): 60-64(In Chinese).

Google Scholar

[6] Liu Xian.Economic load dispatch constraints by wind power availability:a wait-to-see approach.IEEE Transaction on Smart Grid,2010,3(1):347-355.

Google Scholar

[7] Qing Xia,Yuguo Chen,Liang Chen . Power Systems Technology,2011, 35(6):27-33(In Chinese).

Google Scholar