Numerical Simulation Analysis and Engineering Applications on the Double-Side-Wall Heading Step Bench Excavation of Large-Cross Section and Shallow Tunnel

Article Preview

Abstract:

With the pace accelerating of development of urban rail traffic in large and medium-sized cities, urban subway and railway lines need to construct shallow and large-cross section tunnels and especially large-cross section tunnels. Large-cross section tunnel constructions make big influence on the surrounding buildings, roads and environment. How to build underground tunnel fast and safe in the downtown has become an problem which needs to be solved urgently. This article is for the technology of city large-cross section and shallow buried-tunnel, relying on the phase 1 of rail transit no.2 in Changsha, which combined with construction characteristics of the excavation method, double-side-wall method and step method, numerical simulation analysis on influence of the large-cross section tunnel disturbance in the surrounding rock, and provides the necessary technical support.

You might also be interested in these eBooks

Info:

Periodical:

Advanced Materials Research (Volumes 594-597)

Pages:

1182-1187

Citation:

Online since:

November 2012

Export:

Price:

[1] Junsheng YANG, Bao-chen LIU.Ground surface movement and deformation induced by urban tunnel construction[M],Beijing:China Railway Publishing House,2004. In Chinese

Google Scholar

[2] Xinliang Yang, Zhimin Zhao, Yuan LI. Analysis of ground traverse settlement trough caused by shield construction[J], Rock and Soil Mechanics,2007. In Chinese

Google Scholar

[3] Xinliang JIANG, Yong JIA. Analysis of influence of metro tunnel construction on adjacent buildings[J], Rock and Soil Mechanics,2008. In Chinese

Google Scholar

[4] Mingao LIU. Research on Reasonable Clear Interval and Its Construction Method of the Small Interval Tunnel[J], Beijing University of Engineering Science,2006. In Chinese

Google Scholar