Study on the Synthesis Optimization of Time-Cost-Climate in Project

Article Preview

Abstract:

For influence factors to engineering progress in project management of fund, resource allocation and climate etc, establish a schedule control model under the minimum cost. Using genetic algorithms for analysis, obtained the earliest start time of each working procedure at minimum costs. This method can avoid the impact of human factors and provides the powerful theory support for the policy-maker.

You might also be interested in these eBooks

Info:

Periodical:

Pages:

4918-4921

Citation:

Online since:

November 2014

Export:

Price:

* - Corresponding Author

[1] Ahuja H M, Arunachalam V. Risk evaluation in resource allocation. Journal of Construction Engineering and Management, ASCE, 1984, 110(4): 324-336.

Google Scholar

[2] Padilla E M, Carr R I. Resource strategies for dynamic project management. Journal of Construction Engineering and Management, ASCE, 1991, 117(2): 279-293.

DOI: 10.1061/(asce)0733-9364(1991)117:2(279)

Google Scholar

[3] C.C. Wu. Research on Evaluation and control of large engineering project. Hubei: Huazhong University of Science and Technology, (2007).

Google Scholar

[4] Y.F. Lai. Hydropower project schedule control and optimization method. Hubei. Wuhan University, 2001. In chiness.

Google Scholar