Next Article in Journal
Full-Scale Investigation of Dry Sorbent Injection for NOx Emission Control and Mercury Retention
Previous Article in Journal
Automatic Detection of Subsidence Troughs in SAR Interferograms Using Mathematical Morphology
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Selection of Electric Vehicles for the Needs of Sustainable Transport under Conditions of Uncertainty—A Comparative Study on Fuzzy MCDA Methods

Institute of Management, University of Szczecin, Aleja Papieża Jana Pawła II 22A, 70-453 Szczecin, Poland
Energies 2021, 14(22), 7786; https://doi.org/10.3390/en14227786
Submission received: 30 September 2021 / Revised: 11 November 2021 / Accepted: 18 November 2021 / Published: 20 November 2021
(This article belongs to the Section E: Electric Vehicles)

Abstract

:
All over the world, including Poland, authorities are taking steps to increase consumer interest in electric vehicles and sustainable transport as a way to reduce environmental pollution. For this reason, the electric vehicle market is dynamically and constantly developing, more and more modern vehicles are introduced to it, and purchases are often subsidized by the government. The aim of the article is to analyse the A–C segments of the Polish electric vehicle market and to recommend the most attractive vehicle from the perspective of sustainable transport. The aim of the research was achieved with the use of three multi-criteria decision aid (MCDA) methods, which deal well with the uncertainty and imprecision of data that occur in the case of many different parameters of electric vehicles. In particular, the following methods were used: the fuzzy technique for order of preference by similarity to ideal solution (TOPSIS), the fuzzy simple additive weighting (SAW) method, and the new easy approach to fuzzy preference ranking organization method for enrichment evaluation II (NEAT F-PROMETHEE II). Electric vehicle rankings obtained using each method were compared and verified by stochastic analysis. The conducted analyses and comparisons allowed us to identify the most interesting electric vehicles, which currently appear to be the Volkswagen ID.3 Pro S and Nissan LEAF e+.

1. Introduction

Sustainable development is a paradigm of thinking about the future in which the environmental, social and economic goals are balanced, and together they allow us to improve the quality of life [1]. In turn, one of the necessary elements to achieve the goals of sustainable development is sustainable transport [2]. Narrowly defined sustainable transport is transport that minimizes environmental problems and resource depletion, and understood more broadly, it should also maximize social and economic welfare [3]. Electric vehicles (EVs) offer enormous potential for the development of sustainable transport due to their relatively high efficiency and potential independence from unsustainable energy sourcing [4]. It is considered that EVs have even 70% lower environmental impact than diesel vehicles [5]. In particular, we can distinguish battery electric vehicles (BEVs), plug-in hybrid electric vehicles (PHEVs), fuel-cell electric vehicles (FCEVs) and range-extended electric vehicles (REEVs) [6]. The most widespread are BEVs and PHEVs, the market of which has been growing dynamically in recent years both in Europe [7] and all over the world [8]. In 2020 alone, BEV sales in Europe increased by 106% and PHEV by 210%, year-on-year [9]. It should be noted that BEVs are characterized by greater sustainability, but only when they are powered by electricity from renewable sources and managed in a sustainable manner [4]. Moreover, BEVs do not allow the use of an internal combustion engine, and this possibility is abused in the case of PHEVs [6]. Consequently, the market share of BEVs and the number of available models are greater than that of the PHEVs [8]. It is worth adding that along with the growth of the EVs market, the market of charging stations for such vehicles also grows dynamically, both in terms of the number of charging points and the total capacity [9].
Poland, like the entire Europe and the world, aims at the dynamic development of the EVs market in order to maintain a sustainable transport system and adjust it to the goals of the national and European climate and energy policy [10,11]. It is estimated that almost 25% of greenhouse gases (GHG) in Europe are produced by the transport sector [12]. Meanwhile, the objectives of the European Union (EU) climate and energy policy assume, among others, a 40% reduction in GHG emissions by 2030 (compared to 1990) [13], and in the case of Polish energy policy (PEP), it is a 30% reduction by 2030 [14]. According to research, the widespread replacement of conventional cars with EVs could lead to a 36% reduction in GHG by 2050, provided of course with a high share of renewable energy in total energy production [15]. Therefore, the development of the EVs market is also able to achieve the indicated energy goals almost on its own. In the case of Poland, the problem is the methods of generating electricity, because over 80% of the currently produced energy comes from burning fossil fuels [16], including 75% from coal, and 7% from natural gas and crude oil [17]. As a result, the very development of EVs, without changing energy sources, will only change the place of GHG emissions [16]. However, Poland plans to increase the share of renewable energy (mainly from wind farms) in energy production by 65% by 2024, which should to a large extent solve the indicated problem [17].
According to the ‘Sustainable Transport Development Strategy until 2030’ in force in Poland, 600,000 BEVs [18] are to be used on Polish roads by 2030. This goal is more realistic than the previously planned 1 million EVs by 2025 [19], but still difficult to achieve. According to the latest research conducted in Poland, only 13% of respondents consider an EV as the first choice when buying a new car, including 2.7% of them claiming to buy a BEV [2]. In order to encourage consumers to buy BEVs, owners have introduced privileges such as: exemption from fees in paid parking zones, free entry to clean transport zones (which currently do not exist in Poland) and the possibility of using bus lanes [18]. However, these benefits are very small, considering that one of the main reasons for the low popularity of EVs in Poland is their very high price compared to conventionally powered vehicles [2,18]. Therefore, several government subsidy programs for the purchase of BEVs have recently been introduced in Poland. In 2020, these were the programs ‘Green car’, ‘Hummingbird’ and ‘e-Van’. In turn, in 2021, a wider program called ‘My electrician’ [20,21] was introduced. This program gives the opportunity to obtain government funding for the purchase of BEVs (including passenger cars and cargo cars up to 3.5 tons, mopeds, motorcycles, quads). In the case of passenger cars, a subsidy of PLN 18,750 is provided for individual users, and by declaring annual mileage over 15,000 km, a total subsidy of PLN 27,000 can be obtained. The limitation is the price of the vehicle not exceeding PLN 225,000. In addition, for large family card holders (families with at least 3 children), the subsidy is PLN 27,000 regardless of the declared annual mileage and there is no limitation related to the price of the vehicle. Such programs cause the dynamics of the development of the EVs market to increase to some extent. At the end of 2020, 18,875 EVs were on Polish roads, including 10,041 BEVs and 8834 PHEVs, while in August 2021 there were already 29,820 vehicles, including 14,256 BEVs and 15,564 PHEVs. Similarly, there are more and more charging stations, the number of which at the end of 2020 was 1.364, and in August 2021 there were already 1.631 [22]. The market is also developing in terms of the range of available vehicles. In 2018, in the Polish Alternative Fuels Association catalogue presenting EVs available in Poland, there were 20 BEVs and 32 PHEVs [23], for the period 2019/2020 there were 42 BEVs and 63 PHEVs [24], and in the latest catalogue for the years 2020/2021 one can find 101 BEVs and 119 PHEVs [25]. The current ‘My electrician’ subsidy scheme seems so attractive that it can increase the interest in BEVs, and with such a wide choice of BEVs as there is now, it is a difficult task to identify the best one. Even limited to BEVs belonging to the most popular A–C segments, there is a choice between a dozen different vehicles. Due to the fact that the purchase of an EV is several times more expensive investment than the purchase of a vehicle with an internal combustion engine [18], the decision regarding the selection of a specific BEV must be carefully considered. The choice is even more difficult as it required the analysis of many different, often imprecise and conflicting parameters of the vehicle, such as range, charging time, price, safety, etc. This is undoubtedly a multi-criteria problem characterized by uncertainty. On the other hand, multi-criteria decision aid (MCDA) methods, often extended with a fuzzy set theory or stochastic analysis [26], cope with solving such problems. This is confirmed by numerous examples of the use of MCDA methods in decision-making problems related to electric vehicles, or more broadly, with sustainable transport [27]. It should be noted that the solutions obtained with the use of MCDA methods should not be approached indiscriminately, because different MCDA methods may offer different solutions to the same problem [28]. These differences result from: different use of criteria weights, differences in the algorithms of individual methods, the use of value scaling, the use of additional parameters influencing the obtained solution [29]. Therefore, a good practice related to the use of MCDA methods is to compare the solutions obtained using different methods before issuing a recommendation.
The research presented in this article is motivated by the facts about BEVs presented above, so:
  • Large potential of BEVs for the development of sustainable transport;
  • Growing sales and growth of the BEVs market both in Europe and in Poland;
  • Development of infrastructure for BEVs, including the increasing availability of charging stations;
  • The potential for reducing GHG emissions related to BEVs;
  • Ambitious goals for the further development of the BEVs market in Poland;
  • An attractive program of government subsidies for the purchase of BEVs in Poland, attractive for individual users.
All these elements make BEVs an attractive research topic of increasing practical importance and broad management and political implications.
In the context of the presented facts and new regulations on subsidies in the ‘My electrician’ program, practical and methodological research questions can be identified. As for the practical aspect, the article is a search for an answer to the question concerning which of the BEVs available on the Polish market is the optimal choice for sustainable transport, i.e., taking into account economic, social and environmental parameters. On the other hand, the question related to the methodology is whether different MCDA methods will give the same answer to the previous research question, and thus whether they will indicate the same BEV as optimal. Closely related to the indicated research questions is the aim of the research, which is to analyse selected BEVs available on the Polish market and recommend a vehicle that is the best from the perspective of sustainable transport. Here, the limitation was made to consumer vehicles and in particular, A–C segment vehicles are considered because they are more affordable than BEVs in the higher tier segments. The aim of the research was achieved with the use of three MCDA methods, which deal well with the imprecision of data and the uncertainty of decision parameters. The fuzzy technique for order of preference method by similarity to ideal solution (TOPSIS) [30], the fuzzy simple additive weighting (SAW) method [31] and the new easy approach to fuzzy preference ranking organization method for enrichment evaluation II (NEAT F-PROMETHEE II) [32] were used. In addition, a stochastic approach was also used to even better account for the uncertainty of preference and criteria weights. The application of the three methods indicated and the comparison of the results obtained with their help, as well as the extension of the approach to uncertainty through a stochastic approach to preferences, constitutes a scientific contribution to the article.
Section 2 provides an overview of the latest literature on the use of MCDA methods in sustainable transport problems, indicating the approaches to uncertainty used and publications where the results of different MCDA methods were compared. Section 3, broken down into subsections, provides technical details of the MCDA methods under consideration and the stochastic approach used. The results are presented in Section 4, and the article ends with the managerial and political implications set out in Section 5 and conclusions presented in Section 6.

2. Literature Review

The review of the use of MCDA methods in decision-making problems related to the broadly understood transport indicates that the most commonly used are deterministic methods, such as AHP, TOPSIS, PROMETHEE, etc. Fuzzy versions of individual methods are used less frequently, and methods based on the stochastic approach are almost never used [27]. The situation is slightly different in the case of the latest publications strictly related to sustainable transport and EVs. In recent years, in publications on this subject, MCDA methods are used relatively often to capture uncertainty. For the most part, these approaches are based on the fuzzy set theory. Sałabun and Karczmarczyk [33] took up the problem of choosing BEVs for the needs of sustainable urban transport, using the COMET method based on the triangular fuzzy numbers (TrFNs). Ziemba [10], using the PROSA-C method, considered the selection of BEVs for local government and state administration units. In the quoted study, uncertainty was captured using stochastic analysis, namely Monte Carlo simulation. In turn, in the problem of choosing BEVs for private individuals, Ziemba [19] used the NEAT F-PROMETHEE method representing uncertain values as trapezoidal fuzzy numbers (TFNs). Biswas and Das [34] used the crisp MABAC method to build the BEVs ranking, and the criteria weights were defined by the fuzzy AHP method based on TrFNs. Babar et al. [35] used SWOT analysis and fuzzy linear programming with TrFNs to select the appropriate EV type for developing countries, in particular considering the case of Pakistan. Pamucar et al. [36] assessed alternative fuel vehicles from the perspective of sustainable transport. They used TrFNs and the fuzzy FUCOM method to determine the weights of the criteria, and the preferences were aggregated with the SVNF MARCOS method using neutrosophic fuzzy sets (NFS). Xu et al. [37] extended the ELECTRE method to include the interval type-2 fuzzy numbers (IT2FNs), and used this method to select the location for EVs charging stations. A similar decision problem related to locations for EVs charging stations was considered by Erbas et al. [38] and Ju et al. [39] Erbas et al. [38] used the fuzzy version of the AHP method to define uncertain weights of criteria in the form of TrFNs, while the preferences were aggregated using the crisp TOPSIS method, unable to capture the uncertainty. Additionally, Ju et al. [39] expressed the criteria weights in the form of TrFNs using the fuzzy AHP method, and captured the uncertainty of alternatives using picture fuzzy numbers (PFNs) in the grey relational projection. Liu and Wei [40] as well as Zhang et al. [41] took up the problem of risk for the development of EVs charging infrastructure in a public-private partnership. Liu and Wei [40] used the fuzzy TOPSIS method, and uncertain values were represented by TrFNs. In turn, Zhang et al. [41] captured uncertain values in the DEMATEL method using 2-tuple fuzzy numbers (2tFNs). Broniewicz and Ogrodnik [27] in one of their research approaches used TrFNs to represent uncertain weights in the fuzzy AHP method. The uncertainties were in no way captured in the remaining studies on: assessment of BEVs to support purchasing decisions [42], building a ranking of the best BEVs from the perspective of India [43], barriers to the use of EVs [44], fleet composition for small-scale car sharing [45] and urban public transport vehicles [46].
The few cited publications verified the results obtained using the basic MCDA method. Such verification consisted in solving the same decision problem using other MCDA methods. In particular, Ziemba verified the results of the PROSA-C method by solving the same decision problem using the PROMETHEE II method [10], and the results of the NEAT F-PROMETHEE method were verified using the Fuzzy TOPSIS [19]. In turn, Ecer [42] compared the rankings obtained using methods (SECA, MARCOS, MAIRCA, COCOSO, ARAS and COPRAS), and then aggregated these rankings using another seven methods (EDAS, MABAC, WASPAS, CODAS, TOPSIS, Borda and Copeland) while comparing the aggregation results. Similarly, Broniewicz and Ogrodnik [27] solved the decision problem using various combinations of the REMBRANDT/AHP/Fuzzy AHP methods (criteria weighting) and VIKOR/TOPSIS/PROMETHEE methods (preference aggregation).
Table 1 shows all the latest (since 2018) applications of MCDA methods in problems related to sustainable transport. When summarizing and generalizing the conclusions from the analysis of these studies, the growing importance of nondeterministic methods should be noted. However, sometimes these approaches are used only partially, primarily to represent uncertain weights. On the other hand, rarely is a solution to a decision problem obtained by using one of the MCDA methods verified by using another method. In the context of the problem mentioned in the Introduction, consisting in the fact that different methods can give different recommendations, this is undoubtedly a significant imperfection of the cited research, and at the same time an important research gap that gives space for scientific discussion.
Based on Table 1, it can be concluded that the TOPSIS and PROMETHEE methods are often used in the problems of sustainable transport. These methods are relatively uncomplicated in terms of computation, easy to implement and recognized in the scientific community dealing with MCDA methods. Another method of this type, even less computationally complicated, and at the same time widely known, is the SAW method. In practical decision problems and their solutions, it is important that stakeholders trust the methods used to solve the decision problems. Meanwhile, methods using a complicated calculation procedure may be treated by decision-makers as a ‘black box’ [47], which may result in the lack of trust of stakeholders in the recommendations obtained using such methods [48]. It should be noted that the way the data are represented and the type of fuzzy set used have a large impact on the complexity of the fuzzy methods. Generally, it can be said that normal fuzzy sets (type-1) in the form of TrFNs or TFNs are much easier to use and interpret [49], and also much more explainable than other, more advanced, fuzzy set implementations [32,50]. It is believed that the trapezoidal approximation is a reasonable compromise between the tendency to lose too much information and the tendency to introduce too complicated forms of approximation [51]. Due to the need for trust in the obtained solutions, as well as in order to maintain the transparency of the methodology used and the explanation of the obtained results, the NEAT F-PROMETHEE, fuzzy TOPSIS and fuzzy SAW methods based on TFNs were used in this study. The main difference between the methods used is that the fuzzy SAW and fuzzy TOPSIS use the single synthesizing criterion. On the other hand, NEAT F-PROMETHEE uses an outranking relationship [52]. In the fuzzy SAW and fuzzy TOPSIS methods, the only information about the preferences of the decision-maker is the weighting of the criteria. In turn, NEAT F-PROMETHEE additionally uses various functions and thresholds that provide additional information about the preferences of the decision-maker. Moreover, the fuzzy SAW and fuzzy TOPSIS methods use the same data normalization approach but differ in the further stages of the calculations. Fuzzy SAW uses the usual weighted average to aggregate the criteria, while fuzzy TOPSIS uses the positive-ideal and negative-ideal solution [53]. On the other hand, NEAT F-PROMETHEE does not require data normalization, as the normalization process is built into the preference functions used.
Based on the analysis of publications on the selection and evaluation of BEVs presented in Table 1, the criteria used to evaluate such vehicles were identified. These criteria are presented in Table 2. Table 2 shows that for the BEVs’ assessment, first of all criteria describing the technical parameters of the vehicle are used. In addition, there is an economic criterion describing the price of a vehicle, social criteria related to safety, or criteria more related to the environment, such as energy consumption. It should be noted that in this study the criteria were used for which at least two references were indicated in Table 2 as use cases.

3. Materials and Methods

3.1. Research Procedure

The study consisted in solving the decision problem related to the construction of the EV ranking. The A–C segment vehicles available on the Polish market were taken into account. For the most part, these were vehicles meeting the price criterion required to obtain funding under the ‘My electrician’ program. For each of the vehicles, information about its parameters was obtained, some of the parameters were crisp data, and parameters with uncertain values were presented in the form of TFNs. Individual vehicle data were obtained from the Electric Vehicle Database [54] and Euro NCAP [55]. Thus, a performance model F = C ( A ) was defined which included a set of alternatives A = { a ˜ , b ˜ , , m ˜ } (which were considered EVs) and a set of criteria C = { c 1 , c 2 , , c n } (which were played by vehicle parameters). In addition, preference directions, weights, scales, preference functions and thresholds were established for each of the criteria, thus defining the preference model P ( C ) . The alternatives performance model and the preference model provided input to the three fuzzy MCDA methods included in the reference methods collection. These methods were: fuzzy SAW [31], fuzzy TOPSIS [30] and NEAT F-PROMETHEE II [56]. The decision problem was solved using each of the reference methods, resulting in three rankings of alternatives. Moreover, for each of the methods, a robustness analysis of the solution was performed depending on the value of the preference model. The last stage of the research was to compare the results obtained with the use of individual reference methods. The course of the research procedure is presented in Figure 1.

3.2. Basic Assumptions

All reference methods used were based on fuzzy sets and allowed to represent uncertainty using TFNs. TFN a ˜ = ( a 1 , a 2 , a 3 , a 4 ) is described by the membership function μ a ˜ ( x ) [ 0 , 1 ] , according to the Formula (1) [30]:
μ a ˜ ( x ) = { x a 1 a 2 a 1   for   a 1 x < a 2     1 for   a 2 x a 3     x a 4 a 3 a 4   for   a 3 < x a 4   0 ,   o t h e r w i s e
On two TFNs a ˜ = ( a 1 , a 2 , a 3 , a 4 ) , b ˜ = ( b 1 , b 2 , b 3 , b 4 ) one can perform mathematical operations described by Formulas (2)–(8) [31]:
a ˜ b ˜ = ( a 1 , a 2 , a 3 , a 4 ) ( b 1 , b 2 , b 3 , b 4 ) = ( a 1 + b 1 , a 2 + b 2 , a 3 + b 3 , a 4 + b 4 )
a ˜ b ˜ = ( a 1 , a 2 , a 3 , a 4 ) ( b 1 , b 2 , b 3 , b 4 ) = ( a 1 b 4 , a 2 b 3 , a 3 b 2 , a 4 b 1 )
a ˜ b ˜ = ( a 1 , a 2 , a 3 , a 4 ) ( b 1 , b 2 , b 3 , b 4 ) ( a 1 × b 1 , a 2 × b 2 , a 3 × b 3 , a 4 × b 4 )
a ˜ b ˜ = ( a 1 , a 2 , a 3 , a 4 ) ( b 1 , b 2 , b 3 , b 4 ) ( a 1 / b 4 , a 2 / b 3 , a 3 / b 2 , a 4 / b 1 )
a ˜ r = ( a 1 , a 2 , a 3 , a 4 ) r = ( a 1 × r , a 2 × r , a 3 × r , a 4 × r )
a ˜ r = ( a 1 , a 2 , a 3 , a 4 ) r = ( a 1 / r , a 2 / r , a 3 / r , a 4 / r )
r a ˜ = r ( a 1 , a 2 , a 3 , a 4 ) ( r / a 4 , r / a 3 , r / a 2 , r / a 1 )
In order to maintain the consistency of the weights used in the considered MCDA methods, the same linguistic scale was used for each method, taken directly from the fuzzy TOPSIS and NEAT F-PROMETHEE methods. The linguistic values used and the corresponding TFNs are presented in Table 3 [30,32].
Robustness analysis performed for each reference method was based on stochastic simulations [57]. For each of the fuzzy MCDA methods applied, L = 10,000 Monte Carlo trials were carried out, thanks to which the obtained results are characterized by a precision level of 1% while maintaining a confidence level of 95% [19]. In each l-th trial, for each MCDA method, random values of the criteria weights were generated in accordance with the Formula (9):
w j ˜ l = L V x j l   : x j l i . i . d . ~ U { 1 , 7 }
where w j ˜ l denotes the weight of the j-th criterion in the l-th trial, defined as TFN, to which corresponds a specific linguistic value L V x ; x j l is the j-th independent random variable ( j = 1 , 2 , , n ) drawn in the l-th trial ( l = 1 , 2 , , L ), and in practice x j l describes the index of the weight used for the j-th criterion in the l-th trial; i.i.d. means independent and identically distributed; U { 1 , 7 } denotes a discrete uniform distribution when randomizing a number from 1 to 7, and the drawn number is the index of the linguistic value L V x from the sequence of these values.
For the NEAT F-PROMETHEE II method, apart from the criteria weights, other elements of the preference model, i.e., preference functions and thresholds, had to be generated. Preference functions were generated according to the Formula (10):
f k j l   : k j l i . i . d . ~ U { 1 , 6 }
where f k j l denotes the preference function for the j-th criterion in the l-th trial; k j l is the j-th independent random variable ( j = 1 , 2 , , n ) drawn in the l-th trial ( l = 1 , 2 , , L ), and in practice k j l describes the index of preference function used for the j-th criterion in the l-th trial; U { 1 , 6 } denotes discrete uniform distribution when randomizing a number from 1 to 6, and the drawn number is the index of the preference function f k from the sequence of these functions.
To generate thresholds, the sample standard deviation was computed for all criteria treating each TFN as four distinct values, according to the Formula (11):
σ j = i = 1 m t = 1 4 ( y i j t y ¯ j ) 2 4 m 1
where m is the number of alternatives; y i j t is the t-th TFN element describing the j-th criterion of the i-th alternative; y ¯ j is the mean of all y i j t values for the j-th criterion. Standard deviation was the basis for determining the thresholds, based on Formulas (12)–(14):
q j l i . i . d . ~ U ( 0 , 0.75 σ j )
p j l i . i . d . ~ U ( 0.75 σ j , 2.5 σ j )
s j l   i . i . d . ~ U ( 0.2 σ j , 0.6 σ j )
where q, p, and s are successively the indifference, preference and Gaussian thresholds; U ( x , y ) stands for continuous uniform distribution in the given range.
After L trials, the rank acceptability indices are estimated according to the Formula (15) [58]:
b i r B i r L * 100 %
where B i r is the number of trials, in which the i-th alternative achieved the r-th position in the ranking. Rank acceptability indices indicate the estimated probability of achieving a specific position in the ranking of alternatives, provided that the preference model is defined in accordance with the assumptions made. The high b i r alternatives for the best ranks are the most valuable, and the least interesting are those with high acceptability for the worst ranks.

3.3. NEAT F-PROMETHEE II

In the first step of the NEAT F-PROMETHEE II method [32], the fuzzy deviation d ˜ is determined for a pair of alternatives according to the Formula (16):
d j ˜ ( a ˜ , b ˜ ) = c j ( a ˜ ) c j ( b ˜ )
where c j ( a ˜ ) denotes the fuzzy value of the alternative a ˜ on the j-th criterion.
The second step consists in determining the degrees of preference using the selected preference function f k belonging to the sequence F = { f 1 , , f 6 } , according to the Formula (17):
P j ( d j ˜ ) = f k [ d j ˜ ( a ˜ , b ˜ ) ]    
Depending on the selected preference function, the following thresholds can be used: indifference ( q j ), preference ( p j ) or Gaussian ( s j ). The preference functions are described by the Formulas (18)–(23):
  • The usual criterion (f1):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0   for   d j t 0   1   for   d j t > 0     ,   t = 1 , , 4
  • The U-shaped criterion (f2):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0   for   d j t q j   1   for   d j t > q j     ,   t = 1 , , 4
  • The V-shaped criterion (f3):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0         for   d j t 0 d j t p j   for   0 < d j t p j 1         for   d j t > p j     ,   t = 1 , , 4
  • The level criterion (f4):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0     for   d j t q j 1 2   for   q j < d j t p j 1     for   d j t > p j     ,   t = 1 , , 4
  • The V-shaped criterion with an area of indifferenc (f5):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0           for   d j t q j d j t     q j p j     q j   for   q j < d j t p j 1           for   d j t > p j     ,   t = 1 , , 4
  • The Gaussian criterion (f6):
P j ˜ ( d j ˜ ) = ( P j ( d j 1 ) , P j ( d j 2 ) , P j ( d j 3 ) , P j ( d j 4 ) ) = { 0                                                             for   d j t 0   1 exp ( d j t 2 2 s j 2 )       for   d j t > 0   ,   t = 1 , , 4
The NEAT F-PROMETHEE II method performs approximation error correction during mapping. The correction is described by the Formula (24):
{ P j ( d j 2 ) = 0   i f   u d j 1 d j 2 d j 1 > 0.5   for   d j 1 < u d j 2 P j ( d j 3 ) = 1   i f   v d j 4 d j 3 d j 4 > 0.5   for   d j 3 v < d j 4
It should be noted that the u, v coefficients depend on the applied preference function:
  • f o r   f 1 : u = 0 , v = 0 ,
  • f o r   f 2 : u = q j , v = q j ,
  • f o r   f 3 : u = 0 , v = p j ,
  • f o r   f 4 : u = q j , v = p j
  • f o r   f 5 : u = q j , v = p j ,
  • f o r   f 6 : u = 0 , v = .
The next step is to determine the aggregate preference indices according to the Formula (25):
π ˜ ( a ˜ , b ˜ ) = j = 1 n P j ˜ ( d j ˜ ) w j
where w j is defuzzified and normalized ( j = 1 n w j = 1 ) weight of the j-th criterion; n is the number of criteria.
Then, the positive and negative outranking flows should be calculated, and on their basis net outranking flows are calculated, according to the Formulas (26) and (27):
ϕ + ˜ ( a ˜ ) = 1 m 1 i = 1 m π ˜ ( a ˜ , b i ˜ )                             ϕ ˜ ( a ˜ ) = 1 m 1 i = 1 m π ˜ ( b i ˜ , a ˜ )
ϕ n e t ˜ ( a ˜ ) = ϕ + ˜ ( a ˜ ) ϕ ˜ ( a ˜ )
Both the criteria weights and the values ϕ n e t ˜ ( a ˜ ) during the calculation procedure are defuzzified using the centroid method, according to the Formula (28) [59]:
D f C ( a ˜ ) = a 3 2 + a 4 2 + a 3 a 4 a 1 2 a 2 2 a 1 a 2 3 ( a 3 + a 4 a 1 a 2 )

3.4. Fuzzy TOPSIS

In the fuzzy TOPSIS [30] method, a fuzzy decision matrix D ˜ with dimensions m × n is initially constructed. The elements of this matrix are TFNs x ˜ i j = ( a i j , b i j , c i j , d i j ) , which are normalized according to the Formulas (29) and (30) for the benefit and cost criteria, respectively:
p ˜ i j = x ˜ i j d j *   ,   where   d j * = max i d i j
p ˜ i j = a j x ˜ i j   ,   where   a j = min i a i j
The values p ˜ i j obtained in this way are elements of the new normalized fuzzy decision matrix P ˜ [60].
In the next step, the weighted normalized fuzzy decision matrix V ˜ elements are calculated according to the Formula (31):
v ˜ i j = p ˜ i j w ˜ j
Then, the fuzzy positive-ideal solution (FPIS) and fuzzy negative-ideal solution (FNIS) are calculated according to the Formulas (32) and (33), and the distances of alternatives from FPIS and FNIS using Formulas (34) and (35):
F P I S * = ( v ˜ 1 * , v ˜ 2 * , , v ˜ n * ) ,   where   v ˜ j * = max i { v ˜ i j 4 }
F N I S = ( v ˜ 1 , v ˜ 2 , , v ˜ n ) ,   where   v ˜ j = min i { v ˜ i j 1 }
d i * = j = 1 n d v ( v ˜ i j , v ˜ j * )
d i = j = 1 n d v ( v ˜ i j , v ˜ j )
where d v ( x ˜ , y ˜ ) is the distance measure calculated according to the vertex method (36):
d v ( x ˜ , y ˜ ) = 1 4 [ ( x 1 y 1 ) 2 + ( x 2 y 2 ) 2 + ( x 3 y 3 ) 2 + ( x 4 y 4 ) 2 ]
The final value of the i-th alternative is calculated as the closeness coefficient, according to the Formula (37) [61]:
C C i = d i d i * + d i

3.5. Fuzzy SAW

The fuzzy SAW method [31] is somewhat similar to fuzzy TOPSIS, because also in fuzzy SAW a fuzzy decision matrix D ˜ with dimensions m × n is initially constructed. As in fuzzy TOPSIS, the elements of the matrix D ˜ are TFNs x ˜ i j = ( a i j , b i j , c i j , d i j ) , which are normalized according to Formulas (29) and (30) for benefit and cost criteria, respectively, creating a new normalized fuzzy decision matrix P ˜ = { p ˜ i j } .
In the next step, the criteria weights w ˜ j = ( w j 1 , w j 2 , w j 3 , w j 4 ) should be defuzzified using the bisector method, according to the Formula (38):
D f B ( a ˜ ) = a 1 + a 2 + a 3 + a 4 4
Finally, we have to calculate the total fuzzy score based on the normalized values of p ˜ i j and defuzzified weights w j , according to the Formula (39):
v ˜ i j = p ˜ i j w j
The result obtained in this way must finally be defuzzified using the bisector method presented in the Formula (38).

4. Results

In accordance with the presented research procedure, a set of alternatives and a set of criteria were first defined, and then a preference model and an alternative performance model were constructed. Table 4 presents the preference model, including the directions of preferences, weights of criteria, and for the NEAT F-PROMETHEE method, this model additionally takes into account the preference functions and thresholds.
Table 5 shows the performance model developed on the basis of individual vehicle parameters. These parameters are detailed in Appendix A (Table A1). It should be noted that in the case of vehicles with a minimum price lower than PLN 225,000, the C9-Price criterion takes into account the possibility of obtaining the maximum surcharge in the ‘My electrician’ program. The surcharge is PLN 27,000 and the minimum vehicle price included in Table 5 and Appendix A is reduced accordingly.
In the next step, the decision problem defined by the preference model and the performance model was solved. As a result of using each of the three fuzzy MCDA methods, three solutions were obtained in the form of rankings presented in Table 6.
The analysis of the rankings obtained shows that regardless of the MCDA method used, the best vehicle was awarded to A11-Volkswagen ID.3 Pro S, the second was A14-Nissan LEAF e+, the third was A10-Volkswagen ID.3 Pro, and the last was A3-Smart EQ forfour. Therefore, for the adopted weights of criteria, it is a relatively stable sequence, and it is not affected even by additional parameters included in the preference model of the NEAT F-PROMETHEE method. As for the similarity between the individual rankings, it was tested based on the correlation analysis. The Kendall’s tau coefficient, recommended in the case of similarity studies [62], was used here. The correlation values between the rankings are presented in Table 7.
The values of the Kendall’s tau coefficient indicate that the results obtained with the use of individual rankings are very similar. The greatest similarity exists between the fuzzy TOPSIS and fuzzy SAW rankings, which results directly from the fact that both of these methods belong to the group of methods based on utility theory and have many common elements, e.g., the normalization procedure. On the other hand, NEAT F-PROMETHEE belongs to the group of outranking based methods, which means that the ranking generated by it differs slightly more. Interestingly, despite some differences in the rankings of the fuzzy TOPSIS and fuzzy SAW methods, these rankings are equally different from the NEAT F-PROMETHEE II ranking. Scatterplots are included in Figure 2 to better illustrate the differences between the individual rankings. The analysis of Figure 2 shows that in the case of the fuzzy TOPSIS and fuzzy SAW rankings, the differences are only between the ranks of the alternatives A7–A9 and A4–A6. The comparison of the fuzzy TOPSIS and NEAT F-PROMETHEE rankings shows differences in positions 4 to 11. On the other hand, the comparison of the fuzzy SAW and NEAT F-PROMETHEE rankings shows differences in positions 5 to 13.
Another study, which was robustness analysis, concerned a situation where the preference model to be used by a decision-maker is unknown. In this case, the stochastic simulations were aimed at checking the rankings obtained for individual methods in the case of pseudo-random values of the preference model. Table 8, Table 9, Table 10 and Table 11 show the rank acceptability indices for the fuzzy TOPSIS, fuzzy SAW and NEAT F-PROMETHEE methods, respectively. In particular, Table 10 contains the rank acceptability indices obtained for NEAT F-PROMETHEE when only the criteria weights were random, and in the case of Table 11, the weights, preference functions and thresholds were random (see Formulas (9)–(15)).
Comparing the collective results of stochastic simulations to the rankings presented in Table 6, it should be stated that generally speaking, rank acceptability indices confirm the order of alternatives in the rankings. Both in the simulation results and in the rankings, the leading positions are taken by the following alternatives: A11, A14, A10, and A9. On the other hand, the last positions are usually taken by the A3 and A6 alternatives. Some differences between the rankings and the rank acceptability indices can be seen in the case of, for example, A1 and A2 alternatives, which ranked relatively high in the rankings, but the results of the stochastic simulation indicate that these alternatives are not so good.
The analysis of Table 8 and Table 9 shows a high similarity of the simulation results carried out with the use of the fuzzy TOPSIS and fuzzy SAW methods. Taking into account that the assumed simulation error may be 1%, it can be seen that some results are very similar. In particular, it can be seen in the example of alternatives with the highest acceptability values for the highest (A11, A14, A10, A9, and A13) and lowest (A3, A6, A1, and A4) ranks. The similarities are also visible when comparing Table 10 and Table 11, presenting the results of simulations carried out with the use of the NEAT F-PROMETHEE method. In this case, you can see that the highest ranks are the most acceptable for alternatives A11, A14, A9, and A10. In contrast, the worst ranks are the most acceptable for the alternatives A3, A1, A6 and A2. Although they are similar groups of alternatives as in the case of the fuzzy TOPSIS and fuzzy SAW methods, the differences for A9, A10, A1 and A6 are significant. These observations are confirmed by the graphical analysis of the simulation results, presented in Figure 3 (for the fuzzy TOPSIS and fuzzy SAW methods) and Figure 4 (for the NEAT F-PROMETHEE method).

5. Managerial and Political Implications

As mentioned in the Introduction, the basic problem with BEVs in Poland is the Polish energy mix, which is mostly based on coal. As a result, the basic advantages of BEVs, related to the reduction of GHG, lose their importance [63]. However, the situation should improve significantly soon, as the Polish energy policy assumes a significant increase in the share of ‘green’ energy in the energy mix in the coming years [64]. Therefore, the dynamic increase in the share of electric vehicles in the domestic vehicle fleet, assumed by the Polish government, may have positive effects on the emission policy. The subsidy programs aimed at encouraging individual and institutional users to purchase electric vehicles will be of great importance for the implementation of the goals in the field of electric vehicle market development in Poland. The 2020 programs (‘Green car’, ‘Hummingbird’ and ‘e-Van’) were very unsuccessful as only 344 applications were submitted in total for the three programs [65]. Meanwhile, during the first 4 months of the ‘My electrician’ program launched in 2021, over 1000 applications for co-financing for purchases by individual users have already been submitted, and the call for applications for subsidies for enterprises has not yet started [66]. The ‘Green car’ and ‘My electrician’ programs are similar in terms of the number of subsidies, but the main difference between them is the maximum vehicle price limit. This limit was increased almost twice, from PLN 125,000 to PLN 225,000. As a result, in the new ‘My electrician’ program, it is possible to co-finance the purchase of over 40 different BEVs models, while under the previous ‘Green car’ program, funding was available only for 8 BEVs models [67]. So, it should be noted that attractive BEV incentive programs can be effective, but a lot depends on the design of these programs. It is worth adding that the system of support for the electric vehicle market proposed by the government should cover the entire area of electromobility and should also provide subsidies for the charging infrastructure. This infrastructure is a key factor contributing to accelerating the decarbonization of the transport sector in Poland. Therefore, it is planned to launch a support program for the construction of charging points in the near future. Under this program, it is planned to co-finance the construction of about 15,000 charging points [68]. Considering that, in August 2021, there were 3178 charging points (1631 charging stations) in Poland [22], this program may ensure a significant development of infrastructure for EVs. In addition, as part of the ‘My electricity’ program in 2022, it will be possible to obtain a subsidy for private EVs charging points. Combined with the recently introduced legal changes facilitating the installation of private chargers in multi-family buildings, this is another step towards the popularization of EVs in Poland. Another important element in the development of electromobility is the ‘Green public transport’ program, which allows for co-financing of 80% of the purchase costs of electric buses and trolleybuses, as well as 90% of the purchase costs of hydrogen-powered buses [69]. Moreover, the Act on Electromobility [70] adopted the requirements for the modernization of the vehicle fleet in state administration and local government units. In particular, the act obliges state administration bodies to gradually develop the BEVs fleet so that in 2025 they constitute at least 50% of the fleet used. Similarly, local government units were obliged to have a vehicle fleet, which in 2025 will consist of BEVs in at least 30%. These and other programs related to Poland’s energy and emission policy [71] should contribute to the achievement of the assumed GHG emission reduction targets and the development of sustainable transport.
The policy implications cited above provide some managerial insights. Firstly, both the Polish market of EVs and charging stations, will develop dynamically in the coming years, which indicates the legitimacy of investments in related businesses, such as EV sharing and charging stations. Secondly, subsidy programs can be used and are used in the marketing efforts of vehicle manufacturers and dealers by showing the price minus the potential surcharge. Thirdly, manufacturers and retailers of home charging stations can operate in a similar way. Moreover, these two elements can be combined by offering consumers a more comprehensive offer in the form of vehicles with home charging stations and a promise of help in obtaining financing from both programs. Lastly, vehicle manufacturers can and should adapt their market offer to the co-financing programs available in Poland, proposing vehicles with technical and price parameters that guarantee that the investment will be covered by government subsidies.

6. Conclusions

The obtained results made it possible to convincingly answer the research questions posed in the Introduction. As for the question related to the indication of the optimal BEV, the Volkswagen ID.3 Pro S, which has become a new leader in the A–C segments, is currently perhaps the best choice when buying a BEV on the Polish market. In earlier studies, which used other methods and other decision models [10,19], Nissan LEAF e+ dominated, followed by the Peugeot e-208 and Hyundai IONIQ Electric vehicles (depending on the method and decision model). As for the vehicles produced by Volkswagen, in the A–C segments they were electric versions of cars with combustion engine, such as e-Golf, achieving average results compared to other electric vehicles in their segment. Meanwhile, Volkswagen ID.3 Pro S has successfully replaced its predecessors. It should be noted, however, that Nissan LEAF e+ is also a very good vehicle, and its price is much more attractive, which may be of major importance on the Polish market.
As for the second research question, regarding the differences in the results obtained with the use of various fuzzy MCDA methods, it should be stated that the differences are not large. Obviously, the more different the algorithms of individual methods are, the more visible the differences in the obtained results will be. Nevertheless, the extensive analysis of the results obtained with the fuzzy TOPSIS, fuzzy SAW and NEAT F-PROMETHEE methods indicate that the correct construction of the decision model allows us to obtain similar results for various MCDA methods, even in the case of uncertain and imprecise data and partially undefined preference model.
One research limitation is the fact that only BEVs from the A–C segments were included in the study, excluding cars belonging to higher segments. Among others, Tesla Model 3 belonging to the D segment, as well as Tesla Model S (segment F) and Hyundai KONA Electric (segment JB) were omitted, which took leading positions in the research on markets other than Polish [42,43]. However, the inclusion of the indicated vehicles would also require the inclusion of many other cars currently available on the Polish market. Another limitation is related to the dynamic changes on the EVs market, mainly in terms of price changes, as well as the introduction of new vehicles to the market. As a result, comparative studies become outdated to some extent each year.
In connection with the presented conclusions, an interesting direction for further research seems to be the development and broadening of the approaches to uncertainty used in the MCDA methods under study. The combination of the fuzzy and stochastic approaches may in the long run lead to the development of new decision-making methods similar to the stochastic multicriteria acceptability analysis (SMAA) method [72] or other SMAA-based methods [73,74]. These methods can deal with various types of uncertainty and provide valuable recommendations despite the lack of data.

Funding

This research was funded by the National Science Centre, Poland, grant number 2019/35/D/HS4/02466.

Institutional Review Board Statement

Not applicable.

Informed Consent Statement

Not applicable.

Data Availability Statement

Data are contained within the article.

Conflicts of Interest

Author declares no conflict of interest.

Appendix A

Table A1. Parameters of individual EVs.
Table A1. Parameters of individual EVs.
ParameterA1–Renault ZOE R110 A2–Renault ZOE R135 A3–Smart EQ ForfourA4–BMW i3A5–BMW i3sA6–Mini Cooper SEA7–Opel Corsa-eA8–Peugeot e-208A9–Volkswagen ID.3 Pure PerformanceA10–Volkswagen ID.3 ProA11–Volkswagen ID.3 Pro SA12–Hyundai IONIQ ElectricA13–Nissan LEAFA14–Nissan LEAF e+
C1–Acceleration 0–100 km/h (sec)11.49.512.77.36.97.38.18.18.99.67.99.77.97.3
C2–Top speed (km/h)135140130150160150150150160160160165144157
C3–Total power (PS)10913682170184184136136150145204136147218
C4–Total torque (Nm)225245160250270270260260310275310295320340
C5–Battery capacity—useable (kWh)525216.737.937.928.9454545587738.33656
C6–Seats (people)55444455555555
C7–Cargo volume (L)338338185260260211309265385385385357435420
C8–Cargo volume—seats folded (L)122512259751100110073111181106126712671267141711761161
C9–Price (PLN thsnd.)Min. equipment110.4117.471.4142.7157.2112.2101.997.9109.9126.8155157.5128.5137
Max. equipment157.4167.8138.2233.7242.6173.4171.9155.7202.3222.5255.5204195.5211.1
C10–Range (km)EVDB real range31531095235230185275275275350450250220325
WLTP range395385130308283234330339352426549311270385
City—cold weather31030595235230180270270270340440235215320
City—mild weather475465145365355280410415410520660365325485
Highway—cold weather22022065165160130195195195250320175155230
Highway—mild weather28528085215205170250255255325415230200300
Combined—cold weather26526080200195155230230230295380205185275
Combined—mild weather365355110275265215315320320405520290250375
C11–Charging time (m)Wall plug (2.3kW)160516055251170117090013951395139517852370118511101725
1-phase 16A (3.7 kW)10051005330735735555870870870111014707356901080
1-phase 32A (7.4 kW)510510145375375285435435450555735375390600
3-phase 16A (11 kW)3453451202552551953003004503754957356901080
3-phase 32A (22 kW)18018055255255195300300450375495375390600
C12–Fast charging time (m)50kW DC from 10% to 80%5656553636295050445176504062
175kW DC from 10% to 80%5656553636292727443343474035
350 kW DC from 10% to 80%5656553636292727443336474035
C13–Energy consumption (Wh/km)EVDB vehicle consumption 165168176161165156164164164166171153164172
WLTP rated consumption 174177165153161152170164131134135138206180
WLTP vehicle consumption 132135128123134124136133128136140123133145
City—cold weather168170176161165161167167167171175163167175
City—mild weather109112115104107103110108110112117105111115
Highway—cold weather236236257230237222231231231232241219232243
Highway—mild weather182186196176185170180176176178186167180187
Combined—cold weather196200209190194186196196196197203187195204
Combined—mild weather142146152138143134143141141143148132144149
C14–Safety (%)Adult occupant8989788686798491878787919393
Child occupant8080778181738686898989808686
Pedestrian6666655757666656717171707171
Safety assist8585565555566971888888827171

References

  1. Jeronen, E. Sustainability and Sustainable Development. In Encyclopedia of Corporate Social Responsibility; Idowu, S.O., Capaldi, N., Zu, L., Das Gupta, A., Eds.; Springer: Berlin/Heidelberg, Germany, 2013; pp. 2370–2378. [Google Scholar]
  2. Kowalska-Pyzalska, A.; Kott, M.; Kott, J. How Much Polish Consumers Know about Alternative Fuel Vehicles? Impact of Knowledge on the Willingness to Buy. Energies 2021, 14, 1438. [Google Scholar] [CrossRef]
  3. Zhao, X.; Ke, Y.; Zuo, J.; Xiong, W.; Wu, P. Evaluation of Sustainable Transport Research in 2000–2019. J. Clean. Prod. 2020, 256, 120404. [Google Scholar] [CrossRef]
  4. Borén, S.; Nurhadi, L.; Ny, H.; Robèrt, K.-H.; Broman, G.; Trygg, L. A Strategic Approach to Sustainable Transport System Development—Part 2: The Case of a Vision for Electric Vehicle Systems in Southeast Sweden. J. Clean. Prod. 2017, 140, 62–71. [Google Scholar] [CrossRef]
  5. Gustafsson, M.; Svensson, N.; Eklund, M.; Fredriksson Möller, B. Well-to-Wheel Climate Performance of Gas and Electric Vehicles in Europe. Transp. Res. Part D Transp. Environ. 2021, 97, 102911. [Google Scholar] [CrossRef]
  6. Sovacool, B.K.; Kester, J.; Heida, V. Cars and Kids: Childhood Perceptions of Electric Vehicles and Sustainable Transport in Denmark and the Netherlands. Technol. Forecast. Soc. Chang. 2019, 144, 182–192. [Google Scholar] [CrossRef]
  7. Gryparis, E.; Papadopoulos, P.; Leligou, H.C.; Psomopoulos, C.S. Electricity Demand and Carbon Emission in Power Generation under High Penetration of Electric Vehicles. A European Union Perspective. Energy Rep. 2020, 6, 475–486. [Google Scholar] [CrossRef]
  8. Costa, C.M.; Barbosa, J.C.; Castro, H.; Gonçalves, R.; Lanceros-Méndez, S. Electric Vehicles: To What Extent Are Environmentally Friendly and Cost Effective?—Comparative Study by European Countries. Renew. Sustain. Energy Rev. 2021, 151, 111548. [Google Scholar] [CrossRef]
  9. Falchetta, G.; Noussan, M. Electric Vehicle Charging Network in Europe: An Accessibility and Deployment Trends Analysis. Transp. Res. Part D Transp. Environ. 2021, 94, 102813. [Google Scholar] [CrossRef]
  10. Ziemba, P. Multi-Criteria Stochastic Selection of Electric Vehicles for the Sustainable Development of Local Government and State Administration Units in Poland. Energies 2020, 13, 6299. [Google Scholar] [CrossRef]
  11. Piwowarski, M.; Borawski, M.; Nermend, K. The Problem of Non-Typical Objects in the Multidimensional Comparative Analysis of the Level of Renewable Energy Development. Energies 2021, 14, 5803. [Google Scholar] [CrossRef]
  12. Pietrzak, K.; Pietrzak, O. Environmental Effects of Electromobility in a Sustainable Urban Public Transport. Sustainability 2020, 12, 1052. [Google Scholar] [CrossRef] [Green Version]
  13. Ziemba, P. Multi-Criteria Fuzzy Evaluation of the Planned Offshore Wind Farm Investments in Poland. Energies 2021, 14, 978. [Google Scholar] [CrossRef]
  14. Ministry of Climate and Environment. Energy Policy of Poland Until 2040; Ministry of Climate and Environment: Warsaw, Poland, 2021. [Google Scholar]
  15. Xu, L.; Yilmaz, H.Ü.; Wang, Z.; Poganietz, W.-R.; Jochem, P. Greenhouse Gas Emissions of Electric Vehicles in Europe Considering Different Charging Strategies. Transp. Res. Part D Transp. Environ. 2020, 87, 102534. [Google Scholar] [CrossRef]
  16. Godzisz, K.; Dzikuć, M.; Kułyk, P.; Piwowar, A.; Kuryło, P.; Szufa, S. Selected Determinants of Sustainable Transport in the Context of the Development of a Low-Carbon Economy in Poland. Energies 2021, 14, 5418. [Google Scholar] [CrossRef]
  17. Dižo, J.; Blatnický, M.; Semenov, S.; Mikhailov, E.; Kostrzewski, M.; Droździel, P.; Šťastniak, P. Electric and Plug-in Hybrid Vehicles and Their Infrastructure in a Particular European Region. Transp. Res. Procedia 2021, 55, 629–636. [Google Scholar] [CrossRef]
  18. Ewelina, S.-M.; Grysa, K. Assessment of the Total Cost of Ownership of Electric Vehicles in Poland. Energies 2021, 14, 4806. [Google Scholar] [CrossRef]
  19. Ziemba, P. Multi-Criteria Approach to Stochastic and Fuzzy Uncertainty in the Selection of Electric Vehicles with High Social Acceptance. Expert Syst. Appl. 2021, 173, 114686. [Google Scholar] [CrossRef]
  20. Polishnews Surcharges for Electric Cars. My Electrician Program Start. Available online: https://polishnews.co.uk/surcharges-for-electric-cars-my-electrician-program-start/ (accessed on 21 September 2021).
  21. Ministry of Climate and Environment O Programie—Elektromobilność—Portal Gov.pl. Available online: https://www.gov.pl/web/elektromobilnosc/o-programie (accessed on 21 September 2021).
  22. PSPA E-Mobility Meter. Available online: https://pspa.com.pl/research/e-mobility-meter/?lang=en (accessed on 21 September 2021).
  23. Polish Alternative Fuels Association. Katalog Pojazdów Elektrycznych BEV PHEV 2018; Polish Alternative Fuels Association: Warszawa, Poland, 2018. [Google Scholar]
  24. Wiśniewski, J.; Kania, A. Katalog Pojazdów Elektrycznych 2019/2020. Wydanie II; Polish Alternative Fuels Association: Warszawa, Poland, 2019. [Google Scholar]
  25. Wiśniewski, J.; Kania, A. Katalog Pojazdów Elektrycznych 2020/21; Polish Alternative Fuels Association: Warszawa, Poland, 2020. [Google Scholar]
  26. Ziemba, P. Inter-Criteria Dependencies-Based Decision Support in the Sustainable Wind Energy Management. Energies 2019, 12, 749. [Google Scholar] [CrossRef] [Green Version]
  27. Broniewicz, E.; Ogrodnik, K. A Comparative Evaluation of Multi-Criteria Analysis Methods for Sustainable Transport. Energies 2021, 14, 5100. [Google Scholar] [CrossRef]
  28. Wang, X.; Triantaphyllou, E. Ranking Irregularities When Evaluating Alternatives by Using Some ELECTRE Methods. Omega 2008, 36, 45–63. [Google Scholar] [CrossRef]
  29. Zanakis, S.H.; Solomon, A.; Wishart, N.; Dublish, S. Multi-Attribute Decision Making: A Simulation Comparison of Select Methods. Eur. J. Oper. Res. 1998, 107, 507–529. [Google Scholar] [CrossRef]
  30. Chen, C.-T.; Lin, C.-T.; Huang, S.-F. A Fuzzy Approach for Supplier Evaluation and Selection in Supply Chain Management. Int. J. Prod. Econ. 2006, 102, 289–301. [Google Scholar] [CrossRef]
  31. Chou, S.-Y.; Chang, Y.-H.; Shen, C.-Y. A Fuzzy Simple Additive Weighting System under Group Decision-Making for Facility Location Selection with Objective/Subjective Attributes. Eur. J. Oper. Res. 2008, 189, 132–145. [Google Scholar] [CrossRef]
  32. Ziemba, P. NEAT F-PROMETHEE—A New Fuzzy Multiple Criteria Decision Making Method Based on the Adjustment of Mapping Trapezoidal Fuzzy Numbers. Expert Syst. Appl. 2018, 110, 363–380. [Google Scholar] [CrossRef]
  33. Sałabun, W.; Karczmarczyk, A. Using the COMET Method in the Sustainable City Transport Problem: An Empirical Study of the Electric Powered Cars. Procedia Comput. Sci. 2018, 126, 2248–2260. [Google Scholar] [CrossRef]
  34. Biswas, T.K.; Das, M.C. Selection of Commercially Available Electric Vehicle Using Fuzzy AHP-MABAC. J. Inst. Eng. India Ser. C 2019, 100, 531–537. [Google Scholar] [CrossRef]
  35. Babar, A.H.K.; Ali, Y.; Khan, A.U. Moving toward Green Mobility: Overview and Analysis of Electric Vehicle Selection, Pakistan a Case in Point. Environ. Dev. Sustain. 2021, 23, 10994–11011. [Google Scholar] [CrossRef]
  36. Pamucar, D.; Ecer, F.; Deveci, M. Assessment of Alternative Fuel Vehicles for Sustainable Road Transportation of United States Using Integrated Fuzzy FUCOM and Neutrosophic Fuzzy MARCOS Methodology. Sci. Total Environ. 2021, 788, 147763. [Google Scholar] [CrossRef]
  37. Xu, J.; Zhong, L.; Yao, L.; Wu, Z. An Interval Type-2 Fuzzy Analysis towards Electric Vehicle Charging Station Allocation from a Sustainable Perspective. Sustain. Cities Soc. 2018, 40, 335–351. [Google Scholar] [CrossRef]
  38. Erbaş, M.; Kabak, M.; Özceylan, E.; Çetinkaya, C. Optimal Siting of Electric Vehicle Charging Stations: A GIS-Based Fuzzy Multi-Criteria Decision Analysis. Energy 2018, 163, 1017–1031. [Google Scholar] [CrossRef]
  39. Ju, Y.; Ju, D.; Santibanez Gonzalez, E.D.R.; Giannakis, M.; Wang, A. Study of Site Selection of Electric Vehicle Charging Station Based on Extended GRP Method under Picture Fuzzy Environment. Comput. Ind. Eng. 2019, 135, 1271–1285. [Google Scholar] [CrossRef]
  40. Liu, J.; Wei, Q. Risk Evaluation of Electric Vehicle Charging Infrastructure Public-Private Partnership Projects in China Using Fuzzy TOPSIS. J. Clean. Prod. 2018, 189, 211–222. [Google Scholar] [CrossRef]
  41. Zhang, L.; Zhao, Z.; Chai, J.; Kan, Z. Risk Identification and Analysis for PPP Projects of Electric Vehicle Charging Infrastructure Based on 2-Tuple and the DEMATEL Model. World Electr. Veh. J. 2019, 10, 4. [Google Scholar] [CrossRef] [Green Version]
  42. Ecer, F. A Consolidated MCDM Framework for Performance Assessment of Battery Electric Vehicles Based on Ranking Strategies. Renew. Sustain. Energy Rev. 2021, 143, 110916. [Google Scholar] [CrossRef]
  43. Sonar, H.C.; Kulkarni, S.D. An Integrated AHP-MABAC Approach for Electric Vehicle Selection. Res. Transp. Bus. Manag. 2021, 100665. [Google Scholar] [CrossRef]
  44. Adhikari, M.; Ghimire, L.P.; Kim, Y.; Aryal, P.; Khadka, S.B. Identification and Analysis of Barriers against Electric Vehicle Use. Sustainability 2020, 12, 4850. [Google Scholar] [CrossRef]
  45. Lemme, R.F.F.; Arruda, E.F.; Bahiense, L. Optimization Model to Assess Electric Vehicles as an Alternative for Fleet Composition in Station-Based Car Sharing Systems. Transp. Res. Part D Transp. Environ. 2019, 67, 173–196. [Google Scholar] [CrossRef]
  46. Romero-Ania, A.; Rivero Gutiérrez, L.; De Vicente Oliva, M.A. Multiple Criteria Decision Analysis of Sustainable Urban Public Transport Systems. Mathematics 2021, 9, 1844. [Google Scholar] [CrossRef]
  47. Polatidis, H.; Haralambopoulos, D.A.; Munda, G.; Vreeker, R. Selecting an Appropriate Multi-Criteria Decision Analysis Technique for Renewable Energy Planning. Energy Sources Part B Econ. Plan. Policy 2006, 1, 181–193. [Google Scholar] [CrossRef]
  48. Løken, E. Use of Multicriteria Decision Analysis Methods for Energy Planning Problems. Renew. Sustain. Energy Rev. 2007, 11, 1584–1595. [Google Scholar] [CrossRef]
  49. Buckley, J.J. Portfolio Analysis Using Possibility Distributions. In Approximate Reasoning in Intelligent Systems, Decision and Control; Sanchez, E., Zadeh, L.A., Eds.; Pergamon: Amsterdam, The Netherlands, 1987; pp. 69–76. ISBN 978-0-08-034335-8. [Google Scholar]
  50. Ziemba, P.; Becker, A.; Becker, J. Forecasting and Assessment of the Energy Security Risk in Fuzzy Environment. Energies 2021, 14, 5934. [Google Scholar] [CrossRef]
  51. Jankowski, J.; Kazienko, P.; Wątróbski, J.; Lewandowska, A.; Ziemba, P.; Zioło, M. Fuzzy Multi-Objective Modeling of Effectiveness and User Experience in Online Advertising. Expert Syst. Appl. 2016, 65, 315–331. [Google Scholar] [CrossRef]
  52. Guitouni, A.; Martel, J.-M. Tentative Guidelines to Help Choosing an Appropriate MCDA Method. Eur. J. Oper. Res. 1998, 109, 501–521. [Google Scholar] [CrossRef]
  53. Piwowarski, M.; Miłaszewicz, D.; Łatuszyńska, M.; Borawski, M.; Nermend, K. Application of the Vector Measure Construction Method and Technique for Order Preference by Similarity Ideal Solution for the Analysis of the Dynamics of Changes in the Poverty Levels in the European Union Countries. Sustainability 2018, 10, 2858. [Google Scholar] [CrossRef] [Green Version]
  54. EV Database. Available online: https://ev-database.org/ (accessed on 27 September 2021).
  55. The European New Car Assessment Programme|Euro NCAP. Available online: https://www.euroncap.com:443/en (accessed on 30 September 2021).
  56. Ziemba, P. Implementation of the New Easy Approach to Fuzzy Multi-Criteria Decision Aid in the Field of Management. MethodsX 2021, 8, 101344. [Google Scholar] [CrossRef]
  57. Ziemba, P. Monte Carlo Simulated Data for Multi-Criteria Selection of City and Compact Electric Vehicles in Poland. Data Brief 2021, 36, 107118. [Google Scholar] [CrossRef]
  58. Lahdelma, R.; Salminen, P. Stochastic Multicriteria Acceptability Analysis (SMAA). In Trends in Multiple Criteria Decision Analysis; Ehrgott, M., Figueira, J.R., Greco, S., Eds.; International Series in Operations Research & Management Science; Springer: Boston, MA, USA, 2010; pp. 285–315. ISBN 978-1-4419-5904-1. [Google Scholar]
  59. Ziemba, P.; Becker, J. Analysis of the Digital Divide Using Fuzzy Forecasting. Symmetry 2019, 11, 166. [Google Scholar] [CrossRef] [Green Version]
  60. Ziemba, P.; Jankowski, J.; Wątróbski, J. Online Comparison System with Certain and Uncertain Criteria Based on Multi-Criteria Decision Analysis Method. In Proceedings of the Computational Collective Intelligence; Nguyen, N.T., Papadopoulos, G.A., Jędrzejowicz, P., Trawiński, B., Vossen, G., Eds.; Springer International Publishing: Cham, Switzerland, 2017; pp. 579–589. [Google Scholar]
  61. Ziemba, P.; Becker, A.; Becker, J. A Consensus Measure of Expert Judgment in the Fuzzy TOPSIS Method. Symmetry 2020, 12, 204. [Google Scholar] [CrossRef] [Green Version]
  62. Ziemba, P. Towards Strong Sustainability Management—A Generalized PROSA Method. Sustainability 2019, 11, 1555. [Google Scholar] [CrossRef] [Green Version]
  63. Lis, A.; Szymanowski, R. Greening Polish Transportation? Untangling the Nexus between Electric Mobility and a Carbon-Based Regime. Energy Res. Soc. Sci. 2022, 83, 102336. [Google Scholar] [CrossRef]
  64. Kudełko, M. Modeling of Polish Energy Sector—Tool Specification and Results. Energy 2021, 215, 119149. [Google Scholar] [CrossRef]
  65. Forsal Programy Wspierające Rozwój e-Mobilności Okazały się Fiaskiem. Dopłaty do Zakupu Samochodu to za Mało. Available online: https://forsal.pl/motoforsal/motobiznes/artykuly/7799292,pspa-zwiekszyc-dofinansowanie-doplat-aut-elektrycznych.html (accessed on 8 November 2021).
  66. Derski, B. Mój Elektryk: Ponad 1000 Wniosków o Dopłaty do aut Elektrycznych. Available online: https://wysokienapiecie.pl/42083-moj-elektryk-ponad-1000-wnioskow-o-doplaty-aut-elektrycznych/ (accessed on 8 November 2021).
  67. PSPA PSPA o Nowym Programie Dopłat NFOŚiGW. Available online: https://pspa.com.pl/2021/informacja/pspa-o-nowym-programie-doplat-nfosigw/ (accessed on 8 November 2021).
  68. PSPA Program Wsparcia Infrastruktury Ładowania Coraz Bliżej. Available online: https://pspa.com.pl/2021/informacja/program-wsparcia-infrastruktury-ladowania-coraz-blizej/ (accessed on 8 November 2021).
  69. Szoke, E. Green Light for Poland’s Green Public Transport. Available online: https://ceenergynews.com/transport/green-light-for-polands-green-public-transport/ (accessed on 9 November 2021).
  70. Ministry of Energy Ustawa o Elektromobilności i Paliwach Alternatywnych 2018. Available online: https://isap.sejm.gov.pl/isap.nsf/DocDetails.xsp?id=WDU20180000317 (accessed on 19 November 2021).
  71. International Energy Agency Policy Database—Data & Statistics. Available online: https://www.iea.org/policies (accessed on 9 November 2021).
  72. Lahdelma, R.; Salminen, P. SMAA in Robustness Analysis. In Robustness Analysis in Decision Aiding, Optimization, and Analytics; Doumpos, M., Zopounidis, C., Grigoroudis, E., Eds.; International Series in Operations Research & Management Science; Springer International Publishing: Cham, Switzerland, 2016; pp. 1–20. ISBN 978-3-319-33121-8. [Google Scholar]
  73. Arcidiacono, S.G.; Corrente, S.; Greco, S. GAIA-SMAA-PROMETHEE for a Hierarchy of Interacting Criteria. Eur. J. Oper. Res. 2018, 270, 606–624. [Google Scholar] [CrossRef] [Green Version]
  74. Wang, J.; Luo, P.; Hu, X.; Zhang, X. Combining an Extended SMAA-2 Method with Integer Linear Programming for Task Assignment of Multi-UCAV under Multiple Uncertainties. Symmetry 2018, 10, 587. [Google Scholar] [CrossRef] [Green Version]
Figure 1. The applied research procedure.
Figure 1. The applied research procedure.
Energies 14 07786 g001
Figure 2. Scatterplots between: (a) the fuzzy TOPSIS and fuzzy SAW rankings; (b) the fuzzy TOPSIS and NEAT F-PROMETHEE II rankings; (c) the fuzzy SAW and NEAT F-PROMETHEE II rankings.
Figure 2. Scatterplots between: (a) the fuzzy TOPSIS and fuzzy SAW rankings; (b) the fuzzy TOPSIS and NEAT F-PROMETHEE II rankings; (c) the fuzzy SAW and NEAT F-PROMETHEE II rankings.
Energies 14 07786 g002
Figure 3. Graphs of rank acceptability indices obtained using: (a) the fuzzy TOPSIS and (b) fuzzy SAW methods.
Figure 3. Graphs of rank acceptability indices obtained using: (a) the fuzzy TOPSIS and (b) fuzzy SAW methods.
Energies 14 07786 g003
Figure 4. Graphs of rank acceptability indices obtained using the NEAT F-PROMETHEE method for: (a) random weights and (b) random weights, function preferences and thresholds.
Figure 4. Graphs of rank acceptability indices obtained using the NEAT F-PROMETHEE method for: (a) random weights and (b) random weights, function preferences and thresholds.
Energies 14 07786 g004
Table 1. The latest examples of MCDA methods applications in sustainable transport decision-making problems.
Table 1. The latest examples of MCDA methods applications in sustainable transport decision-making problems.
Research ObjectiveLocationApplied MCDA Method(s)Approach to UncertaintyNo. of Criteria/AlternativesRefs.
Selection of a BEV for sustainable city transportPolandCOMETTrFNs6/9[33]
Selection of BEVs with the highest utility for state administration and local governmentPolandPROSA-C/PROMETHEE IIS14/12[10]
Selection of BEVs with the highest acceptance of private individualsPolandNEAT F-PROMETHEE/Fuzzy TOPSIS TFNs, S14/9[19]
Selection and ranking of a group of BEVsUnited StatesFuzzy AHP + MABACTrFNs (CW)5/7[34]
Evaluation of BEVs to support the purchasing decision-SECA/MARCOS/MAIRCA/COCOSO/ARAS/COPRAS + EDAS/MABAC/WASPAS/CODAS/TOPSIS/Borda/Copeland-11/10[42]
Selection and ranking of the best alternative of the BEVMaharashtra state, IndiaAHP + MABAC-6/6[43]
Selection of a viable type of EV for a developing countryPakistanFLPTrFNs10/4[35]
Assessment of alternative fuel vehicles for sustainable road transportationNew Jersey, United StatesFUCOM-F + SVNF MARCOS TrFNs (CW), NFS (PA)20/6[36]
Selection of EV charging station siteTianfu New, ChinaFuzzy ELECTREIT2FNs13/30[37]
Determination of new potential locations for EV charging stationAnkara, TurkeyFuzzy AHP + TOPSISTrFNs (CW)15/12[38]
Selection of EV charging station siteBeijing, ChinaFuzzy AHP + PFWIG + GRPTrFNs (CW), PFNs (PA)14/6[39]
Evaluation of overall risk level of EV charging infrastructure in the framework of public–private partnershipChinaFuzzy TOPSISTrFNs17/3[40]
Identify and classify risk criteria of EV charging infrastructure in the framework of public–private partnershipChina2-tuple DEMATEL2tFNs22/-[41]
Identification and analysis of barriers
against the use of EVs
NepalAHP-17/-[44]
Selection of the fleet composition for small-scale car sharingFortaleza, BrazilILP-7/7[45]
Identification of urban public transport vehicles acceptable under a sustainable thresholdMadrid, SpainELECTRE TRI-7/5[46]
Selection of variant of the expressway sectionNorth-eastern PolandDEMATEL + REMBRANDT/AHP/Fuzzy AHP + VIKOR TOPSIS/PROMETHEE TrFNs (CW)13/6[27]
TrFNs—triangular fuzzy numbers, S—stochastic uncertainty, TFNs—trapezoidal fuzzy numbers, NFS—neutrosophic fuzzy sets, IT2FNs—interval type-2 fuzzy numbers, PFNs—picture fuzzy numbers, 2tFNs—2-tuple fuzzy numbers, CW—criteria weighting, PA—preference aggregation, COMET—Characteristic Objects METhod, PROSA-C—PROMETHEE for sustainability assessment, PROMETHEE—preference ranking organization METHod for enrichment evaluation, NEAT F-PROMETHEE—new easy approach to fuzzy PROMETHEE, TOPSIS—technique for order of preference method by similarity to ideal solution, AHP—analytic hierarchy process, MABAC—multi-attributive border approximation area comparison, SECA—simultaneous evaluation of criteria and alternatives, MARCOS—measurement of alternatives and ranking according to compromise solution, MAIRCA—multi-attributive ideal-real comparative analysis, COCOSO—combined compromie solution, ARAS—additive ratio assessment, COPRAS—complex proportional assessment, EDAS—evaluation based on distance from average solution, WASPAS—weighted aggregated sum product assessment, CODAS—combinative distance-based assessment, FLP—fuzzy linear programming, FUCOM-F—fuzzy full consistency method, SVNF MARCOS—single-valued neutrosophic fuzzy MARCOS, ELECTRE—elimination et choix traduisant la realité, PFWIG—picture fuzzy weighted interaction geometric operator, GRP—grey relational projection, DEMATEL—decision making trial and evaluation laboratory, ILP—integer linear programming, REMBRANDT—ratio estimation in magnitudes or decibells to rate alternatives which are non-dominated, VIKOR—vIsekrzterijumska optimizacija i kompromisno resenje.
Table 2. Criteria used in the assessment of BEVs.
Table 2. Criteria used in the assessment of BEVs.
CriterionReferences
Acceleration/Accelerating time[10,19,34,42]
Battery capacity[10,19,33,42,43]
Cargo volume—seats folded[10,19]
Cargo volume[10,19]
Charging time/Full charging time/Recharging time[10,19,33,36,42,43]
Combined fuel economy[34]
Cub weight[42]
Energy consumption/Energy efficiency[10,19,36,42]
Fast charging time/Quick charging time[10,19,42]
Horsepower/Total power/Maximum power[10,19,33,42]
Maximum torque/Total torque/Torque[10,19,33,43]
Permitted load[42]
Price/Vehicle price/Purchase cost[10,19,33,34,36,42,43]
Range/Battery range/Driving range[10,19,33,34,36,42,43]
Safety[10,36]
Seats/Seating capacity[10,19,43]
Sense of comfort[36]
Top speed[10,19,34,42]
Vehicle appearance[19]
Table 3. Linguistic scale used for the criteria weights.
Table 3. Linguistic scale used for the criteria weights.
No.Linguistic ValueAbbreviationTFN w ˜   =   ( w 1 , w 2 , w 3 , w 4 )
1Very LowVL(0, 0, 0.1, 0.2)
2LowL(0.1, 0.2, 0.2, 0.3)
3Medium LowML(0.2, 0.3, 0.4, 0.5)
4MediumM(0.4, 0.5, 0.5, 0.6)
5Medium HighMH(0.5, 0.6, 0.7, 0.8)
6HighH(0.7, 0.8, 0.8, 0.9)
7Very HighVH(0.8, 0.9, 1, 1)
Table 4. Preference model for the considered problem of EVs assessment.
Table 4. Preference model for the considered problem of EVs assessment.
CriterionUncertainty RepresentationPreference DirectionWeightPreference FunctionIndifference Threshold (qj)Preference Threshold (pj)
C1–Acceleration 0–100 km/h (s)NoMinMH5 0.4 σ j 1.5 σ j
C2–Top Speed (km/h)NoMaxML5
C3–Total Power (PS)NoMaxM5
C4–Total Torque (Nm)NoMaxVL5
C5–Battery Capacity (kWh)NoMaxH3
C6–Seats (people)NoMaxH1
C7–Cargo Volume (L)NoMaxMH3
C8–Cargo Volume (Seats Folded) (L) NoMaxL5
C9–Price (PLN thousands)IntervalMinVH3
C10–Range (km)TFNMaxVH3
C11–Charging Time (m)TFNMinH3
C12–Fast Charging Time (m)TFNMinH3
C13–Energy Consumption (Wh/km)TFNMinM5
C14–Safety (%)TFNMaxVH3
Table 5. Performance model of the considered EVs.
Table 5. Performance model of the considered EVs.
CriterionAlternative
A1–Renault ZOE R110 A2–Renault ZOE R135 A3–Smart EQ ForfourA4–BMW i3A5–BMW i3sA6–Mini Cooper SEA7–Opel Corsa-eA8–Peugeot e-208A9–Volkswagen ID.3 Pure PerformanceA10–Volkswagen ID.3 ProA11–Volkswagen ID.3 Pro SA12–Hyundai IONIQ ElectricA13–Nissan LEAFA14–Nissan LEAF e+
C1(11.4, 11.4, 11.4, 11.4)(9.5, 9.5, 9.5, 9.5)(12.7, 12.7, 12.7, 12.7)(7.3, 7.3, 7.3, 7.3)(6.9, 6.9, 6.9, 6.9)(7.3, 7.3, 7.3, 7.3)(8.1, 8.1, 8.1, 8.1)(8.1, 8.1, 8.1, 8.1)(8.9, 8.9, 8.9, 8.9)(9.6, 9.6, 9.6, 9.6)(7.9, 7.9, 7.9, 7.9)(9.7, 9.7, 9.7, 9.7)(7.9, 7.9, 7.9, 7.9)(7.3, 7.3, 7.3, 7.3)
C2(135, 135, 135, 135)(140, 140, 140, 140)(130, 130, 130, 130)(150, 150, 150, 150)(160, 160, 160, 160)(150, 150, 150, 150)(150, 150, 150, 150)(150, 150, 150, 150)(160, 160, 160, 160)(160, 160, 160, 160)(160, 160, 160, 160)(165, 165, 165, 165)(144, 144, 144, 144)(157, 157, 157, 157)
C3(109, 109, 109, 109)(136, 136, 136, 136)(82, 82, 82, 82)(170, 170, 170, 170)(184, 184, 184, 184)(184, 184, 184, 184)(136, 136, 136, 136)(136, 136, 136, 136)(150, 150, 150, 150)(145, 145, 145, 145)(204, 204, 204, 204)(136, 136, 136, 136)(147, 147, 147, 147)(218, 218, 218, 218)
C4(225, 225, 225, 225)(245, 245, 245, 245)(160, 160, 160, 160)(250, 250, 250, 250)(270, 270, 270, 270)(270, 270, 270, 270)(260, 260, 260, 260)(260, 260, 260, 260)(310, 310, 310, 310)(275, 275, 275, 275)(310, 310, 310, 310)(295, 295, 295, 295)(320, 320, 320, 320)(340, 340, 340, 340)
C5(52, 52, 52, 52)(52, 52, 52, 52)(16.7, 16.7, 16.7, 16.7)(37.9, 37.9, 37.9, 37.9)(37.9, 37.9, 37.9, 37.9)(28.9, 28.9, 28.9, 28.9)(45, 45, 45, 45)(45, 45, 45, 45)(45, 45, 45, 45)(58, 58, 58, 58)(77, 77, 77, 77)(38.3, 38.3, 38.3, 38.3)(36, 36, 36, 36)(56, 56, 56, 56)
C6(5, 5, 5, 5)(5, 5, 5, 5)(4, 4, 4, 4)(4, 4, 4, 4)(4, 4, 4, 4)(4, 4, 4, 4)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)(5, 5, 5, 5)
C7(338, 338, 338, 338)(338, 338, 338, 338)(185, 185, 185, 185)(260, 260, 260, 260)(260, 260, 260, 260)(211, 211, 211, 211)(309, 309, 309, 309)(265, 265, 265, 265)(385, 385, 385, 385)(385, 385, 385, 385)(385, 385, 385, 385)(357, 357, 357, 357)(435, 435, 435, 435)(420, 420, 420, 420)
C8(1225, 1225, 1225, 1225)(1225, 1225, 1225, 1225)(975, 975, 975, 975)(1100, 1100, 1100, 1100)(1100, 1100, 1100, 1100)(731, 731, 731, 731)(1118, 1118, 1118, 1118)(1106, 1106, 1106, 1106)(1267, 1267, 1267, 1267)(1267, 1267, 1267, 1267)(1267, 1267, 1267, 1267)(1417, 1417, 1417, 1417)(1176, 1176, 1176, 1176)(1161, 1161, 1161, 1161)
C9(110.4, 110.4, 157.4, 157.4)(117.4, 117.4, 167.8, 167.8)(71.4, 71.4, 138.2, 138.2)(142.7, 142.7, 233.7, 233.7)(157.2, 157.2, 242.6, 242.6)(112.2, 112.2, 173.4, 173.4)(101.9, 101.9, 171.9, 171.9)(97.9, 97.9, 155.7, 155.7)(109.9, 109.9, 202.3, 202.3)(126.8, 126.8, 222.5, 222.5)(155, 155, 255.5, 255.5)(157.5, 157.5, 204.0, 204.0)(128.5, 128.5, 195.5, 195.5)(137, 137, 211.1, 211.1)
C10(220.0, 274.4, 401.9, 475.0)(220.0, 271.3, 393.8, 465.0)(65.0, 82.8, 122.8, 145.0)(165.0, 207.4, 307.4, 365.0)(160.0, 200.2, 297.7, 355.0)(130.0, 161.8, 236.8, 280.0)(195.0, 239.7, 347.2, 410.0)(195.0, 241.2, 351.2, 415.0)(195.0, 241.7, 349.2, 410.0)(250.0, 306.9, 441.9, 520.0)(320.0, 393.4, 563.4, 660.0)(175.0, 216.3, 311.3, 365.0)(155.0, 191.3, 276.3, 325.0)(230.0, 283.4, 410.9, 485.0)
C11(180.0, 454.5, 1167.0, 1605.0)(180.0, 454.5, 1167.0, 1605.0)(55.0, 145.0, 380.0, 525.0)(255.0, 406.5, 864.0, 1170.0)(255.0, 406.5, 864.0, 1170.0)(195.0, 310.5, 663.0, 900.0)(300.0, 480.0, 1027.5, 1395.0)(300.0, 480.0, 1027.5, 1395.0)(450.0, 586.5, 1059.0, 1395.0)(375.0, 607.5, 1312.5, 1785.0)(495.0, 804.0, 1741.5, 2370.0)(375.0, 528.0, 933.0, 1185.0)(390.0, 522.0, 882.0, 1110.0)(600.0, 808.5, 1371.0, 1725.0)
C12(56.0, 56.0, 56.0, 56.0)(56.0, 56.0, 56.0, 56.0)(55.0, 55.0, 55.0, 55.0)(36.0, 36.0, 36.0, 36.0)(36.0, 36.0, 36.0, 36.0)(29.0, 29.0, 29.0, 29.0)(27.0, 30.8, 42.3, 50.0)(27.0, 30.8, 42.3, 50.0)(44.0, 44.0, 44.0, 44.0)(33.0, 36.0, 45.0, 51.0)(36.0, 43.8, 63.8, 76.0)(47.0, 47.5, 49.0, 50.0)(40.0, 40.0, 40.0, 40.0)(35.0, 39.5, 53.0, 62.0)
C13(109.0, 138.1, 201.6, 236.0)(112.0, 141.0, 203.0, 236.0)(115.0, 144.9, 215.9, 257.0)(104.0, 131.8, 194.8, 230.0)(107.0, 136.3, 201.3, 237.0)(103.0, 129.7, 189.2, 222.0)(110.0, 138.2, 198.7, 231.0)(108.0, 136.2, 197.7, 231.0)(110.0, 135.2, 195.7, 231.0)(112.0, 137.6, 197.6, 232.0)(117.0, 142.7, 204.7, 241.0)(105.0, 129.6, 186.6, 219.0)(111.0, 140.6, 201.1, 232.0)(115.0, 144.7, 208.7, 243.0)
C14(66, 73, 84.5, 89)(66, 73, 84.5, 89)(56, 62.5, 73.5, 78)(55, 62.375, 77.875, 86)(55, 62.375, 77.875, 86)(56, 62.25, 73.75, 79)(66, 71.125, 81.125, 86)(56, 66, 83.5, 91)(71, 77.375, 86.375, 89)(71, 77.375, 86.375, 89)(71, 77.375, 86.375, 89)(70, 75.375, 85.875, 91)(71, 75.625, 86.625, 93)(71, 75.625, 86.625, 93)
Table 6. Rankings of alternatives obtained by individual MCDA methods.
Table 6. Rankings of alternatives obtained by individual MCDA methods.
AlternativeFuzzy TOPSISFuzzy SAWNEAT F-PROMETHEE II
CC ScoreRankTotal ScoreRankΦnetRank
A10.3893962.719−0.077711
A20.4024863.978−0.01999
A30.28431451.9914−0.4714
A40.3722126113−0.093312
A50.37671161.5111−0.061510
A60.37111361.0212−0.111413
A70.4203465.650.05516
A80.4159665.0860.04347
A90.4188565.7440.09424
A100.4426367.7930.13723
A110.4865172.0910.23771
A120.37821062.210−0.018
A130.4081764.9370.06725
A140.4650270.1120.20882
Table 7. Correlations between rankings of individual MCDA methods.
Table 7. Correlations between rankings of individual MCDA methods.
Fuzzy SAWNEAT F-PROMETHEE II
Fuzzy TOPSIS0.9560440.868132
Fuzzy SAW 0.868132
Table 8. Rank acceptability indices (%) obtained using the Fuzzy TOPSIS method.
Table 8. Rank acceptability indices (%) obtained using the Fuzzy TOPSIS method.
RankA1A2A3A4A5A6A7A8A9A10A11A12A13A14
1 ( b i 1 ) 0.1 0.174.0 25.8
2 ( b i 2 ) 0.10.10.10.11.924.9 0.672.2
3 ( b i 3 ) 1.30.70.41.110.273.90.8 9.81.9
4 ( b i 4 ) 0.1 1.70.73.84.268.510.70.30.29.80.1
5 ( b i 5 ) 3.4 0.22.60.615.18.912.410.5 6.040.3
6 ( b i 6 )0.54.9 0.24.91.140.511.15.91.2 20.09.7
7 ( b i 7 )0.711.7 0.57.61.525.525.21.60.9 11.713.3
8 ( b i 8 )2.717.0 1.513.04.411.722.60.80.5 18.57.4
9 ( b i 9 )6.221.9 4.418.66.42.717.90.50.3 16.15.0
10 ( b i 10 )19.913.9 16.1 0.28.10.10.2 11.43.2
11 ( b i 11 )12.111.30.128.828.19.1 0.7 9.10.7
12 ( b i 12 )15.415.9 43.81.617.2 6.00.2
13 ( b i 13 )42.6 0.34.50.251.4 1.0
14 ( b i 14 ) 99.6 0.3
Table 9. Rank acceptability indices (%) obtained using the Fuzzy SAW method.
Table 9. Rank acceptability indices (%) obtained using the Fuzzy SAW method.
RankA1A2A3A4A5A6A7A8A9A10A11A12A13A14
1   ( b i 1 ) 0.170.2 29.6
2   ( b i 2 ) 0.1 0.10.31.827.9 1.268.5
3   ( b i 3 ) 1.11.00.30.713.466.71.30.113.61.8
4   ( b i 4 ) 0.1 1.60.72.52.068.812.30.30.511.10.1
5   ( b i 5 )0.12.5 0.12.60.710.55.312.314.40.29.342.00.1
6   ( b i 6 )0.34.4 0.25.31.134.98.33.42.10.129.210.7
7   ( b i 7 )0.611.8 0.57.81.731.321.01.01.2 13.79.5
8   ( b i 8 )2.315.6 1.311.34.016.425.90.50.6 16.75.4
9   ( b i 9 )5.323.7 3.318.75.43.923.50.30.5 12.13.5
10   ( b i 10 )20.814.5 13.521.57.30.311.20.10.2 8.12.5
11   ( b i 11 )12.89.8 29.628.410.3 1.9 6.90.4
12   ( b i 12 )15.317.7 45.41.716.9 2.90.1
13   ( b i 13 )42.6 0.16.00.150.6 0.5
14   ( b i 14 ) 99.9 0.1
Table 10. Rank acceptability indices (%) obtained using the NEAT F-PROMETHEE II method for random values of criteria weights.
Table 10. Rank acceptability indices (%) obtained using the NEAT F-PROMETHEE II method for random values of criteria weights.
RankA1A2A3A4A5A6A7A8A9A10A11A12A13A14
1 ( b i 1 ) 0.10.169.30.20.230.1
2 ( b i 2 ) 0.31.829.60.30.667.4
3 ( b i 3 ) 1.1 0.140.041.30.82.212.71.8
4 ( b i 4 ) 1.20.20.10.354.424.90.26.811.60.4
5 ( b i 5 ) 0.2 3.80.31.32.34.623.90.134.928.10.4
6 ( b i 6 ) 1.1 0.27.30.613.25.30.36.4 33.332.4
7 ( b i 7 )0.16.2 0.315.10.751.212.60.21.0 6.76.0
8 ( b i 8 )0.77.7 1.210.91.428.537.8 0.4 7.34.1
9 ( b i 9 )1.622.1 3.226.62.54.831.8 0.2 3.83.3
10 ( b i 10 )13.324.5 23.118.38.90.98.2 0.1 1.90.9
11 ( b i 11 )13.913.0 37.015.616.3 1.5 2.40.3
12 ( b i 12 )16.825.2 33.10.124.5 0.3
13 ( b i 13 )53.6 1.8 44.6
14 ( b i 14 ) 100.0
Table 11. Rank acceptability indices (%) obtained using the NEAT F-PROMETHEE II method for random weights, preference functions and thresholds.
Table 11. Rank acceptability indices (%) obtained using the NEAT F-PROMETHEE II method for random weights, preference functions and thresholds.
RankA1A2A3A4A5A6A7A8A9A10A11A12A13A14
1 ( b i 1 ) 0.30.261.20.20.138.0
2 ( b i 2 ) 1.54.137.40.70.755.6
3 ( b i 3 ) 2.70.1 42.236.91.11.711.53.9
4 ( b i 4 ) 0.12.10.5 0.149.728.00.36.011.91.3
5 ( b i 5 ) 0.3 0.26.10.60.80.95.423.00.133.428.01.3
6 ( b i 6 ) 1.8 0.512.61.06.82.90.65.7 35.432.7
7 ( b i 7 )0.39.2 2.025.32.334.57.80.21.2 8.78.4
8 ( b i 8 )1.97.4 5.69.25.037.025.5 0.6 4.92.7
9 ( b i 9 )2.115.2 6.015.64.514.236.5 0.2 3.52.2
10 ( b i 10 )10.020.5 17.012.613.15.617.8 0.1 2.11.2
11 ( b i 11 )14.111.0 32.713.516.40.97.9 3.00.5
12 ( b i 12 )11.734.6 31.80.220.6 0.6 0.50.1
13 ( b i 13 )59.9 4.1 35.9
14 ( b i 14 ) 100.0
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Share and Cite

MDPI and ACS Style

Ziemba, P. Selection of Electric Vehicles for the Needs of Sustainable Transport under Conditions of Uncertainty—A Comparative Study on Fuzzy MCDA Methods. Energies 2021, 14, 7786. https://doi.org/10.3390/en14227786

AMA Style

Ziemba P. Selection of Electric Vehicles for the Needs of Sustainable Transport under Conditions of Uncertainty—A Comparative Study on Fuzzy MCDA Methods. Energies. 2021; 14(22):7786. https://doi.org/10.3390/en14227786

Chicago/Turabian Style

Ziemba, Paweł. 2021. "Selection of Electric Vehicles for the Needs of Sustainable Transport under Conditions of Uncertainty—A Comparative Study on Fuzzy MCDA Methods" Energies 14, no. 22: 7786. https://doi.org/10.3390/en14227786

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop