Serbian Journal of Electrical Engineering 2017 Volume 14, Issue 1, Pages: 113-131
https://doi.org/10.2298/SJEE1701113P
Full text ( 1335 KB)
Cited by
Synchronization method for grid integrated battery storage systems during asymmetrical grid faults
Popadić Bane (University of Novi Sad, Novi Sad)
Katić Vladimir (University of Novi Sad, Novi Sad)
Dumnić Boris (University of Novi Sad, Novi Sad)
Milićević Dragan (University of Novi Sad, Novi Sad)
Čorba Zoltan (University of Novi Sad, Novi Sad)
This paper aims at presenting a robust and reliable synchronization method
for battery storage systems during asymmetrical grid faults. For this
purpose, a Matlab/Simulink based model for testing of the power electronic
interface between the grid and the battery storage systems has been
developed. The synchronization method proposed in the paper is based on the
proportional integral resonant controller with the delay signal cancellation.
The validity of the synchronization method has been verified using the
advanced laboratory station for the control of grid connected distributed
energy sources. The proposed synchronization method has eliminated
unfavourable components from the estimated grid angular frequency, leading to
the more accurate and reliable tracking of the grid voltage vector positive
sequence during both the normal operation and the operation during
asymmetrical grid faults.
Keywords: battery storage systems, synchronization, grid connected converter, asymmetrical grid faults
Project of the Serbian Ministry of Education,
Science and Technological Development, Grant no. III 042004: Integrated and
Interdisciplinary Research entitled: Smart Electricity Distribution Grids
Based on Distribution Management System and Distributed Generation