Pengembangan Sistem Manajemen Risiko di Badan Perencanaan Pembangunan Daerah (BAPPEDA) Kota Bontang berdasarkan Kerangka ISO 31000 Development of a Risk Management System at the Regional Development Planning Agency (BAPPEDA) of Bontang City based on the ISO 31000 Framework

Main Article Content

Wijdani Anindya Hadi
Putu Dana Karningsih

Abstract

Procurement is one of activity of government institution. ULP Bontang as a procurement unit is a part of Bappeda Bontang. Due to importance of procurement process, ULP Bontang needs to manage its risks by identifying, analyzing and controlling potential risk that may impedes ULP objectives. All goverment institution refer to a Internal Government Controlling System which called by Sistem Pengendalian Intern Pemerintah (SPIP) for conducting its risk management. Since there are several part of SPIP is not applicable in ULP Bontang. Therefore in this research, SPIP is modified based on ISO 31000 framework. Moreover, Delphi method is utilized to identiry riks involving five experts and established 23 potential risk in ULP Bontang. The modifications were also made in developing of severity and probability tables corresponding to the conditions of ULP Bontang. The formulation of mitigation recommendation concerned by very high potential risks. The mitigation for risk number (12) ULP Bontang office is not representative are securing ULP office using fingerprint device so only authorized personel allowed to enter the office. The cost required for this mitigation is about Rp 30.000.000 and Rp 32.000.000 for CCTV installation and evacuation route sign and also ULP needs to partnership with other institution to securing ULP Bontang member.

Article Details

How to Cite
Hadi, W. A., & Karningsih, P. D. (2017). Pengembangan Sistem Manajemen Risiko di Badan Perencanaan Pembangunan Daerah (BAPPEDA) Kota Bontang berdasarkan Kerangka ISO 31000. PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 1(1), 11-16. https://doi.org/10.21070/prozima.v1i1.701
Section
Articles

References

[1] Peraturan Wali Kota No. 36. (2012), Tugas Pokok Bappeda Kota Bontang. Bontang.

[2] Keputusan Presiden R.I. Nomor 80. (2003), Pedoman Pelaksanaan Pengadaan Barang/ Jasa Pemerintah. Jakarta.

[3] Markmann, Christoph., Darkow, Inga-Lena., Gracht, Heiko von der. (2012), “A Delphi-based risk analysis-Identifying and assessing future challenges for supply chain security in a multi-stakeholder environment”, Technological Forecasting & Social Change (80), page 57-79.

[4] AS/NZS 4360. (2004), 3rd Edition The Australian And New Zealand Standard on Risk Management, Broadleaf Capital International Pty Ltd, NSW Australia.

[5] Hanafi, M.M. (2006), Manajemen Risiko, UP STIM YKPN, Jogjakarta.

[6] Djunaedi, Z. (2005), Prinsip Dasar Manajemen Risiko (Risk Management). FKM UI. Depok.

[7] Widiasih, Wiwin. (2015), Development of Risk Management In Lean Manufacturing Implentation Approaching by Integrated Method Case Study : PT. Dirgantara Indonesia, Thesis, Institut Teknologi Sepuluh Nopember, Surabaya.

[8] Ciptomulyono, U. (2001), Integrasi Metode Delphi dan Prosedur Analisis Hierarkhis untuk Identifikasi dan Penetapan Prioritas Objektif/Kriteria Keputusan. Majalah IPTEK Jurnal Pengetahuan Alam dan Teknologi, 12(1).