Performance improvement of the particle swarm optimisation algorithm for the flexible job shop problem under machines breakdown
by Rim Zarrouk; Imed Eddine Bennour; Jemai Abderrazak
International Journal of Intelligent Engineering Informatics (IJIEI), Vol. 6, No. 3/4, 2018

Abstract: One of the most challenging problems in the manufacturing field is to solve the flexible job shop problem (FJSP) subject to machine breakdowns (caused a loss of time). The meta-heuristic particles swarm optimisation (PSO) is well suited to solve the FJSP but it might be time consuming specially on monocore platforms. In this paper, we propose a set of PSO-FJSP variants that aim to improve the run time of the pre-scheduling step. Then we propose three rescheduling variants to handle machine breakdowns: two variants aim to improve the robustness of the schedule, while the third aims to improve the stability of the schedule. Standard benchmarks are used to evaluate and compare the proposed variants.

Online publication date: Sun, 20-May-2018

The full text of this article is only available to individual subscribers or to users at subscribing institutions.

 
Existing subscribers:
Go to Inderscience Online Journals to access the Full Text of this article.

Pay per view:
If you are not a subscriber and you just want to read the full contents of this article, buy online access here.

Complimentary Subscribers, Editors or Members of the Editorial Board of the International Journal of Intelligent Engineering Informatics (IJIEI):
Login with your Inderscience username and password:

    Username:        Password:         

Forgotten your password?


Want to subscribe?
A subscription gives you complete access to all articles in the current issue, as well as to all articles in the previous three years (where applicable). See our Orders page to subscribe.

If you still need assistance, please email subs@inderscience.com