Abstract
This paper analyzes the weak links of the power grid from the perspectives of grid operation and future investment management of power grids. Based on the research theory, the matching algorithm of investment project and weak link of power grid is constructed based on 0-1 planning and empirical analysis is carried out. This paper construct a model based on constraints such as the maximum objective value of the net present value rate and the investment ratio, calculate and analyze the case, get the investment results, and optimize the resource allocation.