LEPTON ACCELERATORS AND COLLIDERS

Linear optics calibration and nonlinear optimization during the commissioning of the SSRF storage ring

, , , , , and

2009 Chinese Physical Society and the Institute of High Energy Physics of the Chinese Academy of Sciences and the Institute of Modern Physics of the Chinese Academy of Sciences and IOP Publishing Ltd
, , Citation Tian Shun-Qiang et al 2009 Chinese Phys. C 33 83 DOI 10.1088/1674-1137/33/S2/021

1674-1137/33/S2/83

Abstract

Phase I commissioning of the SSRF storage ring on 3.0 GeV beam energy was started at the end of December 2007. A lot of encouraging results have been obtained so far. In this paper, calibrations of the linear optics during the commissioning are discussed, and some measured results about the nonlinearity given. Calibration procedure emphasizes correcting quadrupole magnetic coefficients with the Linear Optics from Closed Orbit (LOCO) technique. After fitting the closed orbit response matrix, the linear optics of the four test modes is substantially corrected, and the measured physical parameters agree well with the designed ones.

Export citation and abstract BibTeX RIS

10.1088/1674-1137/33/S2/021