Skip to main content
Log in

Evaluation of the role of waste in a truck manufacturing line using simulation

  • Published:
Journal of Intelligent Manufacturing Aims and scope Submit manuscript

Abstract

In their never-ending search to improve manufacturing performance, companies try to eliminate all sources of waste. In this paper, we describe how the effects of the elimination of waste on performance measures such as lead time and overtime costs can be estimated using logistical simulation. This is illustrated using a real-life case study that was conducted in the repair department of a truck cabin factory. In this department, cabs are controlled and if necessary repaired. The first part of the paper describes how bottlenecks were determined for both the present layout and for a proposed layout change. This turned out to be difficult, as several product flows ‘intertwine’. Modelling was made complex by these interactions, as they caused deadlock phenomena. The second part of the paper represents a sensitivity analysis, which evaluates the effects of different types of waste, such as machine breakdowns, inadequate buffer size and production time variance.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Ajala, C. (1992) Wasteful practices: handicaps to the JIT process. Industrial Engineering, November, 55–57.

  • Andries, B. (1995) Lead time reduction: value analysis and WIP control, working paper, WP 95-02, K.U. Leuven, Centre for Industrial Management.

  • Coleman, B. J. and Vaghefi, M. R. (1994) Heijunka (?): a key to the Toyota production system. Production and Inventory Management Journal, Fourth Quarter, 31–35.

  • de Treville, S. (1987) Disruption, learning, and system improvement in just-in-time manufacturing. Doctoral Thesis, Helsinki School of Economics and Business Administration.

  • Forrester, J. W. (1961) Industrial Dynamics, MIT Press, Cambridge, MA.

    Google Scholar 

  • Goldratt, E. M. and Fox, R. E. (1986) The Race, North River Press, Croton on Hudson.

    Google Scholar 

  • Grünwald, H. J. and Fortuin, L. (1992) Many steps towards zero inventory. European Journal of Operational Research, 59 359–369.

    Google Scholar 

  • Inman, R. R. (1993) Inventory is the flower of all evil. Production and Inventory Management Journal, Fourth Quarter, 41–45.

  • Nakajima, S. (1989) TPM Development Program: Implementing Total Productive Maintenance, Productivity Press, Cambridge.

    Google Scholar 

  • Robinson, A. G. and Schroeder, D. M. (1992) Detecting and eliminating invisible waste. Production and Inventory Management Journal, Fourth Quarter, 37–42.

  • Rohrer, M. (1996) AutoMod/Simulator Tutorial, in Proceedings AutoSimulations Symposium, pp. 1–12.

  • Schonberger, R. J. (1984) Just In Time: A Comparison of Japanese and American Techniques, Industrial Engineering and Management Press, Norcross, GA.

    Google Scholar 

  • Shingo, S. (1988) Non-Stock Production: the Shingo System for Continuous Improvement, Productivity Press, Cambridge.

    Google Scholar 

  • Womack, J. P. and Jones, D. T. (1996) Beyond Toyota: how to root out waste and pursue perfection. Harvard Business Review, September-October, 140–158.

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

SMET , R.D., GELDERS , L. Evaluation of the role of waste in a truck manufacturing line using simulation. Journal of Intelligent Manufacturing 8, 449–458 (1997). https://doi.org/10.1023/A:1018566417895

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1023/A:1018566417895

Navigation