1 Introduction

Fossil fuels such as coal, natural gas and petroleum are among the most preferred energy sources nowadays. These resources are considered to be unlimited in the world and are used unplanned. These energy sources are not unlimited, and they are negatively affected by some reasons such as unconscious use, greenhouse gases and industrialization [1]. One of the preferred solutions to use these resources more efficiently and to minimize the greenhouse gas effect is renewable energy sources [2, 3].

Renewable energy sources have been attracted great attention in recent years. Although global energy that related to CO2 emissions have increased, some countries have decreased their electricity generation emission values due to the use of renewable energy capacity. According to the data of renewable energy policies, when the renewable energy investments around the world are examined, the total investment for 2017 was 279.8 billion dollars [4].

The advantages the use of renewable energy are recognized worldwide as a result of significant investments made in developed countries such as China, USA, Japan, India and Germany [5].

In 2018, many important steps were taken to renewable electricity generation in some parts of the world. For example, Australia increased its renewable energy sources to 20% for the first time, while Costa Rica provided 300 days of energy to the countries from renewable energy with 100% [5].

In early 2019, renewable electricity generation in the USA approached levels of coal-fired power generation, and renewable generation nearly doubled between 2008 and 2018 years. In Europe, Portugal generated more than half of its electricity consumption from renewable sources in 2018, while the UK was set annual records in production shares for both onshore (9.1%) and offshore (8%) for the wind energy. For the first time, the EU has generated more than 15% of annual electricity using wind and solar power [5].

In this respect, the next century seems to be important in using the sun and its derivatives and other inexhaustible and clean energy resources [6, 7].

There are a large number of alternative energy sources that can replace fossil fuels in energy use such as wind energy and hydropower. In addition to these resources, solar energy is a natural resource that can replace fossil fuels because they cause less harm to the environment and provide the unlimited energy [8, 9]. In addition to environmental contributions, solar energy can provide more economic gain compared to fossil resources.

Since these resources are more sustainable than other sources, they can meet the world's energy consumption demands. Today, we can say that energy consumption based on solar energy was increased by 50%. Studies estimate that the global share of the solar energy consumption will be 16% by 2050 [10]. As of 2020, the global share of energy consumption based on solar energy is 12% in the world [11].

Although solar energy sources have ecological and economic advantages, there are some difficulties that prevent wide use worldwide. Firstly, as a result of the geographical location, the desired efficiency cannot be obtained from the solar energy. This potential decreases or increases depending on the geographical position of the study area. The other point is that they need very large areas for the built of solar energy panels. For example, as a result of the study, a total of 80 acres is needed for a solar panel area of 5 MW power. An average of 20 acres of area is needed for a 1 MW solar panel [12].

Later, since the materials that are used in the built of the panels are metal or similar, these materials cause negativity in terms of aesthetic appearance in a large area. Another negative feature is that not all of these systems are used as energy. Energy losses occur in the conversion of the energy that is obtained from the panels into electrical energy.

As a result of researches, it has been determined that the efficiency of solar panels is between 15 and 20% [13]. As a result of the technical studies carried out in the recent years, this efficiency has increased up to 40% [14, 15]. Another negative feature is that the investment costs of solar panels are very high [16]. Soydan [12] stated that the costs for the solar panels are recovered after 9 years. However, considering that the average usage time of the panels is 20 years, it can be said that this period is not too long [17].

1.1 Solar energy in Turkey

Turkey's economic growth, increasing population, industrialization and energy needs in parallel with the improvement of living conditions is increasing rapidly. Turkey is considered poor in terms of fossil fuels.

The domestic production of the energy demand decreased by 22% between the 1990 to 2013 years, and foreign dependence has increased at the same rate. 43–50% is the share of natural gas in electricity production over the last decade in Turkey. This is a clear proof that high dependence on imported natural gas [18].

The use of the solar energy is very important to ensure diversity of sources of electricity production, struggling to reduce global warming and dependence on foreign sources for the fossil fuels.

According to the 2018 data of the Ministry of Energy [19], 31.9% of the power is hydraulic, 25.6% is natural gas, 21.5% is coal, 7.9% is wind, 5.7% is solar, 1.4% is by geothermal and 5.9% is from other sources. In 2018, the number of solar power plants in operation is 5868. Total solar energy power is reached 5063.0 MW, of which 4,981.2 MW is unlicensed, and 81.8 MW is licensed.

The share of solar panels in total electricity production in Turkey has increased to 2.5% with 7477.3 GWh [19, 20]. Energy and Natural Resources Ministry [19,20,21] published the “World and Turkey's Energy and Natural Resources View”; according to the report, as of 2014, within the total electricity production of 251.963 GWh, 17.4 GWh generation (0.01% share) was from solar energy; as of 2016, it has reached 972 GWh in total production of 273.387 GWh (0.36% share) [19,20,21].

In 2018, the total power of unlicensed solar power plants increased to 4.981 MW. The annual average increase in electricity demand for the 20-year period in 2019 was calculated as 2.90%–3.84% according to different scenarios. It is predicted that it will reach 376 billion kWh in 2023 and 613 billion kWh in 2039. It is predicted that the share of renewable energy sources will increase even more in meeting this demand [19,20,21].

1.2 Approach to the build of solar panels

It is possible to gather the studies on solar panels under three groups. Some of them are the studies (Klepacha et al. [22], Bayrakçı and Tezer (2019) [23], Baka et al. [24]) on the cost analysis of solar panels.

In the second group, there are studies (Strielkowski et al. [25], Da Cunha et al. [26], Kocaman et al. [27]) to determine the advantages of solar panels in terms of energy. In the last group, there are studies (Koç et al. [28], Wang et al. [29]) on the site selection for the most energy efficiency from solar panels. Since this study focuses on select the suitable location in terms of solar panels, it can be included in this group.

Although there are many studies (Wang et al. [29], Alsabbagh [30], Suri [31]) related to solar panels in the world, Turkey also does not have too many studies (Geçen [32], Sarsıcı [33], Oral et al. [34]) on this subject.

The studies are mostly focus on cost analysis. However, the most important factor affecting the cost analysis is the site selection. There are very few studies for site selection of solar panels in Turkey. The criteria that were used in the studies were found to be insufficient. This study aims to determine the most suitable location for solar panels using AHP method and various criteria.

It is thought that this study will contribute significantly to the literature in Turkey in terms of the selected method and criteria. The number of these studies is quite low, especially in terms of landscape architecture professional discipline. It can be thought that the study will contribute to this issue as well.

Nigde has one of the most sun in Turkey. Turkey's annual solar energy potential is 380 billion KWh. Average annual sunshine duration per square metre is 2640 h, and average annual solar energy potential is 1,303 kWh.

These data correspond to a power of 3.6 kWh with a sunshine duration of approximately 7.2 h per square metre per day [19]. Compared to the other provinces in the region, Nigde is the leader with the highest annual average global radiation value of 1620 kWh/m2-year.

The average daily sunshine duration of Nigde is 8.03 h, and the average daily global radiation value is 4.44 kWh/m2-day [35]. Nigde is suitable area for the solar panel investments due to reasons such as weak pasture areas and high solar radiation values.

Nigde gets sun about 300 days of the year. Nigde has a very wavy topography due to its location. Due to this topography and the sunshine duration, Nigde is in a very suitable region in terms of solar panels built. That is why Nigde was selected as the study area.

The aim of this study is to select the most suitable location for solar energy plants and provide to build solar power plants in suitable places. Eleven data layers (sunshine duration, solar radiation, slope, aspect, road, water sources, residential areas, earthquake fault line, mine areas, power line and transformers) that were prepared using AHP analysis method in GIS were used and analysed.

Based on the results of the analysis, the location of the areas where solar energy could be built was selected.

2 Material and methods

2.1 Material

The study area includes the city of Nigde as a whole. Nigde is located in 34°30′10′′-34°45′00′′ eastern longitude and 37°54′00′′-38°06′30′′ northern latitude. The size of the study area is 7795.22 km2. Nigde has a climate which is hot and dry in summers, and cold and snowy in winters.

According to the 84-year climate values covering the 1935–2019 years, the lowest temperature was found in January with − 25.6 °C and the highest temperature in August with 38.5 oC. The annual rainfall varied between 5.2 and 48.7 mm [36].

In this study, aspect and slope maps were produced using elevation map which has 30 m resolution. The properties of the data which were used in the study are given in Table 1.

Table 1 Properties of the data

LULC (land-use and land-cover) classes were defined from satellite images obtained in 2019 using visual interpretation through ENVI 5.3, Harris Geospatial Solutions, USA. Then, the LUCC maps were classified into nine different land-use classes using the supervised classification method [37, 38]:

  1. (1)

    urban areas,

  2. (2)

    sparsely vegetated areas,

  3. (3)

    industrial units,

  4. (4)

    pasture lands,

  5. (5)

    agricultural lands,

  6. (6)

    broadleaved forest,

  7. (7)

    coniferous forest,

  8. (8)

    watercourses,

  9. (9)

    bare land.

The reason for using these data in the study is to remove the agricultural areas, residential areas and water surfaces in the area. The suitability or unsuitability of these areas will not change the result. It is very difficult to build solar panels on these areas. Residential areas and water surfaces are insufficient and impossible in terms of areas where solar panels need to be build. Therefore, these areas were removed in the final map. Agricultural areas were removed on the final map due to its ecological damage.

2.2 Method

The data that were determined for the study were arranged in the GIS and shown with the created maps. The data were scored by the "Euclidean distance" method. The normalized data were reclassified and divided into 5 classes; it was scored by giving the most suitable value “5” and the least suitable value “1”. Suitable areas for solar plant were determined and visualized by adding on the satellite image.

In the solar energy site selection, the AHP method in GIS was used to determine the most suitable power plant areas to be built for the province of Nigde. After determining the necessary criteria, some arrangements have been made to process the data. In the first stage, all data were converted to UTM, WGS84 and 36 N coordinate system. After the data were converted to the suitable coordinate system, the data in vector format were converted to a raster format. All data which were used in the study were converted into raster format. The purpose of this transformation is to ensure that each factor is scored in the specified class range (with the Reclassify command), and all data are overlaid with the weight coefficients (with the Weighted overlay command) in order to determine the suitable areas for solar panels.

Raster data were analysed based on the "Euclidean distance" method. After this process, the score (suitability) of the layer that expresses each criterion was determined according to the quality. Criteria maps were created by standardizing the layers. The values in the maps are provided in a fixed range between 1 and 5. It has been determined that many criteria are used in the build of the solar power plant. ArcGIS software was used in the study. In the study, 11 factors were determined in order to determine suitable areas for solar panels. The determined factors are that:

  1. 1.

    Sunshine duration

  2. 2.

    Solar radiation

  3. 3.

    Slope

  4. 4.

    Aspect

  5. 5.

    Proximity to the power line

  6. 6.

    Proximity to transformers

  7. 7.

    Distance to water resource areas

  8. 8.

    Distance to fault line

  9. 9.

    Proximity to residential areas

  10. 10.

    Distance to mining areas

  11. 11.

    Proximity to roads

Nigde is not located in an area that has not a lot of rainfall or natural disasters. Temperature value is not important for panels, and sunshine duration and solar radiation values are important. Therefore, climatic parameters were ignored within the scope of the study. However, it should not be forgotten that these factors are valid only for this study and the number of criteria may increase or decrease depending on the region. There are many factors in determining the site selection of the solar power plant. In addition, while calculating the scores for each classification, it was benefited from previous studies on this subject such as Jung et et al. [9] and Kum et al. [7]. Maps of sunshine duration, solar radiation, slope, aspect, proximity to the power line, proximity to transformers, distance to water resource areas, distance to fault line, proximity to residential areas, distance to mining areas, proximity to roads were done according to the values given in Table 2.

Table 2 Weighting coefficients of the evaluation criteria

It is advantageous to use the GIS method in order to ensure that these factors are compatible, monitored, interpreted and managed. “Analytical hierarchy process” (AHP) method was used to determine the weight coefficients of the factors.

AHP is a mathematical method that takes into account the priorities of the group or individual and evaluates the qualitative and quantitative variables together [39, 40]. As it is a simple, easy to use and understandable method, it is a frequently used technique among multi-criteria decision-making methods.

In this study, it was tried to reach the results by using too many factors. AHP method was used to determine the weight coefficients of the factors among each other and to determine the weight coefficients of each factor in the site selection of the solar energy panels.

AHP method calculates the consistency rate as a result of determining the weight coefficients established among the factors. This consistency rate gives an idea about whether this relationship is right or wrong. This is a very important step to prove the accuracy of the study. If the relationship between the number of factors and these factors is determined clearly, the accuracy of the results will increase. Due to these features, AHP method was preferred in the study.

2.2.1 Analytical hierarchy process (AHP)

AHP is a mathematical method that takes into account the priorities of the group or individual and evaluates the qualitative and quantitative variables together. There are many studies (Garni et al. [41], Çolak and Kaya [42]) in which AHP method is used for the build of solar panels. As it is a simple, easy to use and understandable method, it is a frequently used technique among multi-criteria decision-making methods. AHP consists of four steps.

Step 1 Decision-making problem is identified.

The decision-maker determines the necessary factors and sub-factors. At this stage, a survey study can be conducted or the opinions of experts on the subject can be obtained.

Step 2 The binary comparisons matrix is created.

This step is the most important of AHP. After determining the factors and sub-factors, the degree of importance of these factors among themselves is determined.

For this, binary comparison matrix is created. This matrix is “A” (Table 3). The 1–9 scale of importance which is recommended by Saaty [43] is used to create these matrices (Table 4).

Table 3 1–9 importance scale [43, 44]
Table 4 Matrix A obtained by binary comparisons [44]

“W” values in the matrix show how important the “i” factor is compared to the “j” factor.

Values on the diagonal of the created matrix are expressed by a number. “I” and “j” are the same criteria. Factors which are considered for comparison should be homogeneous. In terms of consistency and accuracy of the scale, the number of alternatives should be less than nine. If it is taken more than nine, clustering should be done homogeneously according to common features [44].

Step 3 The weight factor is calculated.

The comparison matrix shows the importance levels of factors relative to each other. But to determine the weight of these factors within all factors, column vectors that make up the comparison matrix are used. Finally, column “B” with n number and n components is created (Eq. 1).

$$b_{ij} = \frac{{a_{ij} }}{{\mathop \sum \nolimits_{i\_1}^{n} a_{ij} }}$$
(1)

“aij ” is the row and column elements of the binary comparison matrix.

With the number of factors here, the more B column vectors are obtained. When n number B column vectors are combined in a matrix format, the C matrix is formed.

The arithmetic mean of the row values of the matrix C is obtained, and the W column vector weight matrix is obtained (Eq. 2).

$$W_{i} = \frac{{\mathop \sum \nolimits_{j = 1}^{n} c_{ij} }}{n}$$
(2)

Step 4 Consistency in factor comparisons is measured.

AHP is consistent in itself. However, the accuracy of the results depends on the consistency in the decision-maker's comparison between the factors. In order to measure the consistency in these comparisons, CR value which is called accuracy rate is calculated, and the consistency of the weight matrix can be tested. Therefore, the consistency of the model is checked by comparisons between factors. The calculation of the CR value is based on comparing the number of factors with a coefficient called the base value (λ). When calculating the λ value, the D column vector is obtained from the comparison matrix A and the weight matrix of W. The basis value (E) for each evaluation factor is obtained from the section of the mutual elements of the weight column D and the weight matrix of W. (Eq. 3). The arithmetic mean of these values gives the basic value (λ) for comparison (Eq. 4).

$$E_{i} = \frac{{d_{i} }}{{w_{i} }} \left( {i = 1,2, \ldots ,n} \right)$$
(3)
$${\uplambda } = \frac{{\mathop \sum \nolimits_{i = 1}^{n} E_{i } }}{n}$$
(4)

After calculating the basic value λ, the consistency indicator (CI) is calculated with Eq. (5).

$${\text{CI}} = \frac{{{\uplambda } - {\text{n}}}}{{{\text{n}} - 1}}$$
(5)

The value of "n" in the equations is the number of factors. Finally, the CI value is divided by the standard correction value which is called the random indicator (RI), shown in Table 4, and the CR value that is called consistency ratio is obtained (Eq. 6).

The value corresponding to the number of factors is selected from Table 5.

Table 5 Random indicator

For example, the RI value to be used in a 3-factor comparison will be 0.58 according to Table 5.

$${\text{CR}} = \frac{{{\text{CI}}}}{{{\text{RI}}}}$$
(6)

For the comparisons made by the decision-maker to be consistent, the calculated CR value must be less than 0.10.

If the CR value is higher than 0.10, there is either a calculation error in AHP or it is inconsistent in the decision-maker comparison.

2.2.2 Using AHP method in the study

“A” matrix where binary comparisons were made according to the importance of the factors selecting site in the study area was created (Table 6). Weight factor was calculated for each criterion. For this, the elements in each column of the binary comparison matrix were divided by the sum of the column it is found (Eq. 1) and the “B” column vectors were calculated.

Table 6 Binary comparisons of criteria which affect selected suitable areas

Since there were 11 factors, 11 “B” column matrices were created.

By combining the “B” column matrices, the “C” matrix was obtained (Table 7).

Table 7 “C” matrix from “B” matrices

By taking the average of each line in the “C” matrix, the “W” weight matrix was created according to the Eq. (2) (Table 8). The model was developed for this study, and it is based on the statistical weights for each variable calculated in the previous item.

$$\begin{aligned} &{\text{IR}} = (0.{23}*{\text{Sunshine}} + 0.{23}*{\text{Solar radiation}} + 0.0{8}*{\text{Slope}} + 0.{13}*{\text{Aspect}} + 0.0{8}*{\text{Proximity to the power line}} + 0.0{8}*{\text{Proximity to transformers}} \\ &+ 0.0{4}*{\text{Distance to water surfaces}} + 0.0{4}*{\text{Proximity to roads}} + 0.0{4}*{\text{Distance to fault line}} + 0.0{4}*{\text{Proximity to residential areas}} + 0.0{4}*{\text{Distance to mining areas}}). \\ \end{aligned}$$
(7)
Table 8 “W” matrix from “C” matrices

According to Table 8, sunshine duration and solar radiation were the highest value 23% (C1 and C2). Then there was aspect (C4) with 13% and slope (C3) with 6%. The consistency checks of the weight values and the model were made. For this, the matrix “A” which is called the binary comparison matrix and the “W” weight matrix were multiplied and the “D” matrix was obtained.

Using the Eq. (3), the “D” column vector elements were divided into “W” weight matrix elements and the “E” matrix was created (Table 9).

Table 9 D and E matrices created for consistency ratio control

Because there are eleven factors in the study, the value of λ was calculated using the Eq. (4) (by taking n = 11). By dividing the sum of each element of the matrix “E” by n = 11, the value of λ was found to be 11.82. With Eq. 5, consistency indicator “CI” value was calculated as 0.082.

According to the random indicator (RI) table, in an eleven-factor comparison, the RI value is seen as 1.51.

Accordingly, it is seen that the consistency rate (CR) value obtained by dividing the “C”I value by 1.51 is 0.05. This value is well less than the critical limit of 0.10, which indicates that the model installed is consistent.

The "kriging method" was used to obtain the solar radiation distribution map in the study area. The reason for this is that there is no solar radiation data for all regions and areas in Nigde.

Kriging is an interpolation method that estimates the optimum values of the data at other points by using the data obtained from the closest known points.

Kriging interpolation method is a technique in which unbiased estimation of positional changes at sampled points using semi-variogram structural properties is optimally made [45].

It is possible to see examples of the kriging method in many studies (Yang [46], Nam and Hur [47]).

3 Results

3.1 Study area

Nigde is located in Cappadocia of the south-east of Turkey's Central Anatolia region. Nigde is neighbouring Aksaray, Nevsehir, Kayseri and Konya Provinces, is separated from Mersin Province with Bolkar Mountains in the south, and is separated from Adana Province with the natural borders formed by Aladaglar from the south-east and east (Fig. 1).

Fig. 1
figure 1

Study area boundaries

The high solar energy potential of the Nigde allows the build of the solar plants. Nigde had 10 solar power plants as of 2019.

The lowest power of the solar plants is 1.00 MW, and the highest power is 45.00 MW. For the 2020 year, 2 solar power plants have been just built [19].

All existing solar power plants are located in Bor and central districts of the Nigde. The location and limits of the study area are shown in Fig. 1.

3.2 Analysis

3.2.1 Slope analysis

Different studies (Garni and Wasthi [41], Jun et al. [9]) suggest different slope values for the site selection in areas where solar energy will be built. Hang et al. [48] stated that the most suitable slope value is between 1 and 3%.

For the site selection, areas that have over 3% slope are not suitable.

However, in cases where there are no suitable areas with these slope values,However, in cases where there are no suitable areas with these slope values, Miller and Lumby [49] stated that areas that have on 5% slope can be selected. Various studies (Gasparovic and Gasparovic 2019 [50]) state that 0% slope areas are not suitable for the build of solar power plants.

In this study, the areas with a score of 3, 4 and 5 are suitable for the build of solar power plants in terms of slope (Fig. 2).

Fig. 2
figure 2

Slope point map

Slope values were divided into two classes as less than 5% slope (suitable areas) and more than 5% slope (unsuitable areas) (Fig. 3).

Fig. 3
figure 3

Slope map

3.2.2 Aspect analysis

Solar power plants should be built in areas that have not shade.

While east, west and south should be preferred, other aspects should not be preferred.

According to Miller and Lumby [49], flat and south aspect should be preferred for the site selection of power plants. Areas with a south aspect provide high sunshine according to different seasonal conditions. Therefore, south aspect is preferred for the solar plants. Aspect maps are created using DEM (digital elevation model). Northern areas were removed from the areas for aspect analysis, and suitable areas are determined as suitable and not suitable and shown on the map (Figs. 4 and 5).

Fig. 4
figure 4

Aspect map

Fig. 5
figure 5

Aspect point map

3.2.3 Traffic network analysis

According to the environmental impact assessment of the relevant ministry [51], the inappropriateness of the areas within 100 m of safety lane should be considered. Since the proximity to the traffic networks provide (suitable) advantage, the nearest areas were determined as 5 points (the most suitable). Since the distance to the traffic networks increases the cost and build processes, these areas were determined as 1 points (the least suitable). The map that was created for the traffic network is shown in Fig. 6.

Fig. 6
figure 6

Traffic network map

3.2.4 Power line analysis

The proximity of the solar power plants to the energy transmission line provides an advantage in terms of efficiency.

The solar power plants to be built in remote areas to power lines increase energy loss and decrease efficiency.

In order to the transfer cost of the energy to be suitable, the nearest areas were determined as 5 points, and remote areas were determined as 1 point. The map that was created for the power lines is shown in Fig. 7.

Fig. 7
figure 7

Power line map

3.2.5 Transformer analysis

The proximity of the solar power plants to be built to the transformer provides an advantage in terms of efficiency. Power plants to be built in areas remote to the transformer cause energy loss and decrease efficiency. In the study, the nearest areas were determined as 5 points, and remote areas were determined. The map that was created for the transformers is shown in Fig. 8.

Fig. 8
figure 8

Transformer analysis map

3.2.6 Solar energy potential analysis

Information about the sunshine duration and solar radiation was obtained from the stations of the General Directorate of Meteorology [36].

These stations are not available in the entire study area. Therefore, the kriging method was used in order to map the sunshine duration and solar radiation of the entire study area.

The optimum value for solar energy potential is determined to be 2,500 h/year. All districts of the Nigde Province have a sunshine duration above this value. The map that was created for the solar energy potential is shown in Fig. 9.

Fig. 9
figure 9

Sunshine duration map

3.2.7 Water source analysis

If solar plants build near to the rivers, their efficiency decreases due to fog, evaporation, humidity and river flood risk.

It has been determined that the solar plants will be built remote from the water sources.

Areas that are remote from the waters sources were evaluated as most suitable (5 points) and nearest areas were evaluated as least suitable (1 point).

The map that was created for the water source is shown in Fig. 10.

Fig. 10
figure 10

Water map

3.2.8 Fault line analysis

Fault lines are criteria that should be taken into account for the solar power plant site selection since the study area is located in a tectonically active area.

Areas that are remote from the fault lines are more suitable for the build of solar plants.

As it gets closer to the fault lines, suitability decreases. A classification map of the distance to the fault line was created (Fig. 11).

Fig. 11
figure 11

Fault line map

3.2.9 Residential analysis

According to Obit [52], solar panel plants should be located in least 5 km and at most 10 km from the residential areas. According to the environmental impact assessment of the relevant ministry, it is not suitable for built the solar power plants within 500 m in the residential areas. The areas up to 5 points (most suitable), 4 points, 3 points and 2 points were determined to be suitable for building a solar power plant in terms of residential areas. The determined distances are visualized with settlement areas conformity map (Fig. 12).

Fig. 12
figure 12

Residential map

3.2.10 Mine areas analysis

Solar power plants should be built in remote areas from the mining areas. The purpose of building the panels remote to mining areas is to prevent solar plants from being affected by dust and pollution that may occur by drilling, digging, throwing and filling of mines and quarries. The areas (suitable) distance from the mining areas on the map are shown (Fig. 13).

Fig. 13
figure 13

Mining map

3.2.11 Solar radiation analysis

According to the data obtained from the General Directorate of Renewable Energy (REGD), the lowest radiation level from the sun is between 1500 and 1550 kWh/m2 in Ulukisla district, and the highest solar radiation from the sun is between 1750 and 1800 kwh/m2 in Camardi district in Nigde. Average annual solar radiation is 1650 kWh/m2 in Nigde [53]. The solar potential of Nigde is given in Fig. 14 [54].

Fig. 14
figure 14

Solar radiation map of Nigde

The areas where the solar power plant can be built in the Nigde Province, Euclidean distance for each layer, sunshine duration, solar radiation, slope, aspect, proximity to the power line, proximity to transformers, distance to water resource areas, distance to fault line, proximity to residential areas, distance to mining areas, and proximity to road were obtained and shown in the maps. As a result of combining the layers classified in the intervals determined by using Eq. (7), a single raster layer was created for the suitable areas. Suitable areas where a solar power plant could be built were determined in the study area.

However, residential areas, water surfaces and agricultural areas were removed from the map that was obtained before. Since the area sizes and populations of the residential areas will vary, it has been removed from the map.

Agricultural areas were removed from the map due to the ecological and economic contributions that they provided. Land-use/land-cover map was created for these reason. Land-cover/land-use map is shown Fig. 15. The map that shows the most suitable areas for solar panels in Nigde is given in Fig. 16.

Fig. 15
figure 15

Land cover of Nigde

Fig. 16
figure 16

Areas where solar panels can be built

3.3 Evaluation of the study area in terms of the build of solar panels

Suitable areas where a solar power plant could be built were determined in the study area. As a result of the analysis, the most suitable areas to build a solar power plant are the north-west and eastern part of Nigde. However, it has been determined that the middle parts of the study area are not suitable for the build of solar plants.

When the study area was examined for the solar panel build, the highest score was 4 point. According to the results, 5 points and 1 point could not be obtained from the study area. When the districts with the highest or lowest eligibility in selecting the location for solar plants are examined, there is no suitable place for solar plant in Camardi district.

After Camardi district, the area with the least suitable place for solar plants is Ciftlik district. The district with the highest potential solar plant areas is Ulukisla. With the field study conducted in Nigde, 8 of the 10 solar power plants were determined to be in suitable areas determined on the map.

Thus, it was determined that correct results were obtained from the final map. However, all of the existing solar plants are located in Bor and central districts of the Nigde. According to the results of the analysis, it is suitable to build solar plants in Bor district. However, the central district has very little suitable place for the build of solar plants. For this reason, solar plants to be built to Nigde later on should be constructed in Ulukisla district.

We can say that central district can be selected due to factors such as accessibility, cost and sun. However, the central district should not be preferred for the solar plants to be built from now on, in order to obtain higher efficiency from the plants and no less damage to the natural environment.

There are some problems regarding the site selection of solar panels in Nigde Province. The topography of Nigde Province has a wavy structure. Therefore, it is very difficult to find a flat area except for the central and Bor districts. This causes the cost to increase. In other districts, the topographical structure of the areas other than residential areas is very wavy.

Therefore, most of the existing panels are located in central and Bor districts for various reasons such as cost and labour. However, as a result of the analyses, it was determined that these two districts are less suitable than other districts.

In particular, Ulukisla district has the highest values in terms of solar potential in Nigde. Failure to make panels in these areas only due to topography causes losses in terms of energy efficiency. Suitable areas should be created for the built of the panels with new planning studies and engineering calculations (such as excavation–fill) to be made in these areas. Although these plans are high in terms of initial cost, considering the value of the energy to be obtained, these costs will be worthless. Although this topographic structure of the Nigde causes problems in terms of built, it offers some advantages.

First of all, due to this topographic structure, the sunshine duration and solar radiation rate of Nigde are high. As a result of the analysis, it has been determined that 37.46% of the Nigde has south, south-east, south-west and flat aspects. Considering that in particular the south views area is a region with a lot of sun, we can say that Nigde Province has a great importance in terms of solar energy potential. The province of Nigde is in a region that has a "valley" appearance as an urban silhouette. Therefore, in particular high areas get a lot of sun. Using solar panels for built in these areas will provide serious gains in terms of energy costs not only for the province of Nigde, but also for its immediate surroundings.

Although the energy cost of Nigde is not as much as Istanbul or Ankara, which are large metropolitan cities in Turkey, urbanization causes increase to energy cost. Therefore, with the increasing number of buildings, traffic and industrial facilities near the city, the energy cost in Nigde is increasing. Despite the increase in energy costs and the high potential of Nigde in terms of solar energy, the number of solar panels in Nigde and the number of incentives and investments for the panels are quite insufficient. There are 10 solar panels in Nigde Province. Ankara which is the capital city of Turkey has solar radiation rate of 1,473 kWh/year, according to which the Nigde potential is quite low (proportion of the province of Nigde solar radiation 1,620 kWh/year) [19].

Despite this disadvantage, there are a total of 50 solar panels in Ankara Province. Although they are similar in terms of topography and climate, this difference between the number of panels causes losses in terms of energy efficiency.

We can say that this difference is due to reasons such as the fact that Nigde has less industry compared to other provinces and its population is less than other regions. However, these factors are not used for the site selection of solar panels in any study, including this study.

For this reason, the solar potential of the Nigde should be considered, not the population density or its industrial, and planning should be made accordingly.

4 Conclusion

In today's world, energy consumption is increasing day by day. Societies have to increase their competitiveness, grow their economies and improve their quality of life for their level of technological development. Production of clean energy is of great importance in ensuring technological development and sustainability. Solar energy, which is among the renewable energy sources, is stated to be environmentally friendly as their source is both abundant and a continuous and renewable energy source.

AHP (analytical hierarchy process) method was used to evaluate the factors in the study. The method was found suitable in terms of taking into account more than one factor, revealed the relationships between the factors quantitatively and calculated the consistency rate using various analyses. However, the get difficult of mathematical process with the increase in factors was determined as the deficient features of the method.

This result was compared with the previous studies. Kum et al. [7] stated that the AHP method suitable for solar panels site selection in their study. Garni and Awasthi [41] used the AHP method in their study on the site selection of solar panels in Saudi Arabia and concluded that the method is suitable for such studies. In this respect, this study is similar to previous studies on the subject. However, other studies did not state any results regarding the number of factors. This study differs from other studies in this respect.

In this study, 11 factors were used to determine the most suitable areas for solar panels. When the studies on the subject are examined, the number of factors is sufficient. Solangi et al. [55] used 6 factors in their study such as orography, environment, climate, economy, topography and social criteria. These factors were also used in this study.

Wiguna et al. [56] used 6 factors in their study such as distance to residential area, slope, aspect, distance to road, distance to energy sources and solar radiation. These factors were used within the scope of the study. Therefore, the factors used in the study are quantitatively and qualitatively suitable. Although very few, we can say that rainfall data are also used in some studies on the subject. Rainfall data were not used in this study.

This is one of the shortcomings of the study, and this is entirely related to the region that was studied. Nigde Province is located in an area that as not much rainfall. These data were not included in the factors, as the use of precipitation data was not considered to affect the result. The biggest problem in terms of climate for the Nigde is "frost" in the winter months. This is a problem in the whole city. Therefore, it was not included in the study. The most important factors that affect the site selection of solar panels were the sunshine duration and solar radiation with a rate of 23%. Sunshine duration was the factor with the highest rate in the previous studies. Tunç et al. [57] in their study in Istanbul, Turkey, found the sunshine duration as the most important factor.

Also, similar results have been found in many studies. However, it should not be forgotten that these results will change with the characteristics of the region and the ratio of the number of factors. This ratio may decrease or increase depending on the number of factors that will be used. It should not be forgotten that these values belong to this study, since the climatic characteristics and topographic structure of the region will change these results.

The study has scientific innovations as well as deficiencies. In previous studies, land use/land cover was not among the factors. In this study, it was determined that the land use/land cover is an important factor for the build of solar panels, and the land use/land cover can change the results. When other factors such as the distance to transformer centres and roads are taken into account besides the land use/land cover, the results will be changed. The determination of the analyses and the suitability map made in the study with the existing status of the land show the accuracy of the results. The determined areas will contribute to the economy of the country and meet the energy needs of this region.

Solar energy, which has become a new research area and at the same time an energy source for the countries, will help to make site selection studies based on multi-criteria. Because, since in recent years, Turkey's policy towards renewable energy consequently arises questions that need to be established where will be the solar PV power plants, this study will serve as an example to this question for decision-making support system.

In order to benefit from renewable energy at the highest level, it is necessary to use GIS more effectively and to expand the field of work in future studies. In addition, the results of the energy values obtained from the solar panels to be built in the suggested areas should be measured, and the accuracy of the study should be clearly demonstrated. One of the shortcomings of the study is that the results obtained in this study could not be applied on the land.

Studies are made to these issues in Turkey for more metropolitan cities. The fact that this study was carried out in underdeveloped cities such as Nigde will be an example for future studies.

When Nigde Solar Energy power plants are evaluated in terms of location selection efficiency criteria, it is seen that the location selection decision is suitable.

When the suitable locations are evaluated in terms of environmental impact, it has been determined that the agricultural areas will not be affected by the power plants since the land-use capability 1, 2, 3 and 4 class.

The situation that is expected to be the most ecologically affected by solar power plants is that the birds are affected by the reflected light from the plants. Nigde is located on the seasonal migration route of the birds.

However, it is expected that this effect will be at the minimum level since the plants are located in remote areas to the river and lake areas.

As of 2019, Turkey also reached 1,362.60 MW of built solar power. 108 MW energy is produced from solar energy plants located in Nigde Province [19]. It has been determined that 18% of annual consumption in Nigde Province originates from solar plants. "Active use of the Renewable Energy systems transformation project" statement is included in the strategic plan report of Nigde Municipality covering 2015–2019 [58]. This study will be the reference for the solar plants to be made from now on.

Landscape design elements should be considered during the positioning of the solar plants. The areas that will allow solar plants to get sun should not be covered with vegetative elements. The south facade, which will allow the plants to take the sun, must be open. In order to remove the visual pollution that will occur as a result of positioning the plants, the areas outside the south facade should be covered with vegetative elements.

It may be suggested that the areas next to the electrical transformers should be left blank for the future solar plants, to reduce the build cost of the transmission cables to the substations, which will allow this energy to be stored and distributed after electricity generation.

As a result of the meeting with experts, 20 acres of land should be considered for each 1 MW solar plant, and the area usage planning should be done according to this criterion.

Comparing environmental impact assessment of solar power plants to other power plants, it has been determined to have less impact than other plants. The visual effect of the power plants is high and the noise effect is almost non-existent.

These evaluations show that solar power plants do not produce clean energy completely, they have various environmental effects, but as a result of comparisons, solar power plants have less effect than thermal power plants. It is an acceptable fact that the energy produced, regardless of its source, has various effects on the environment.

The discourses, policies and practices regarding the fact that solar energy generation systems are a completely clean energy source do not match. In this respect, it is recommended that solar energy is preferred in terms of energy production, considering it to be a cleaner energy production source compared to fossil fuel power plants, less destruction to the environment and being renewable. Nevertheless, it is very important to evaluate the environmental dimensions of solar power plants and to make applications that will minimize their environmental impact and to make location selection decisions [59].