Skip to main content
Log in

Advanced nitrogen removal using pilot-scale SBR with intelligent control system built on three layer network

  • Research Article
  • Published:
Frontiers of Environmental Science & Engineering in China Aims and scope Submit manuscript

Abstract

Since eutrophication has become increasingly severe in China, nitrogen and phosphorous have been the concern of wastewater treatment, especially nitrogen removal. The stabilization of the intelligent control system and nitrogen removal efficiency were investigated in a pilot-scale aerobic-anoxic sequencing batch reactor (SBR) with a treatment capacity of 60 m3/d. Characteristic points on the profiles of dissolved oxygen (DO), pH, and oxidation reduction potential (ORP) could exactly reflect the process of nitrification and denitrification. Using the intelligent control system not only could save energy, but also could achieve advanced nitrogen removal. Applying the control strategy water quality of the effluent could stably meet the national first discharge standard during experiment of 10 months. Even at low temperature (t = 13°C), chemical oxygen demand (COD) and total nitrogen (TN) in the effluent were under 50 and 5 mg/L, respectively.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Brenner A. Use of computers for process design analysis and control: Sequencing batch reactor application. Water Sci and Technol, 1997, 35(1): 95–104

    Article  CAS  Google Scholar 

  2. Wang B L, Zhou Y J. Application of modern communication and control technologies in urban sewage treatment. Process Automation Instrumentation, 2004, 25(5).

  3. Charpentier J, Martin G, Wacheux H, Gilles P. ORP regulation and activated sludge: 15 years of experiences. Water Sci and Technol, 1998, 38(3): 197–208

    Article  CAS  Google Scholar 

  4. Lee D S, Jeon C O, Park J M. Biological nitrogen removal with enhanced phosphate uptake in a sequencing batch reactor using sludge system. Water Res, 2001, 35(16): 3968–3976

    Article  CAS  Google Scholar 

  5. Pavšelj N, Hvala N, Kocijan J RošM, šubelj M, Mušic G, Strmcnik S. Experimental design of an optimal phase duration control strategy used in batch biological wastewater treatment. ISA Transactions, 2001, 40: 41–56

    Article  Google Scholar 

  6. Peng Y Z, Gao J F, Wang S Y, Sui M H. Use pH and ORP as fuzzy Control parameters of denitrification in SBR process. Water Sci and Technol, 2002, 46(4–5): 131–137

    CAS  Google Scholar 

  7. Zeng W, Peng Y Z, Wang S Y, Gao J F, Li T W. Fuzzy control of SBR process using DO as parameter. China Water & Wastewater, 2000, 16(4): 5–10 (in Chinese)

    CAS  Google Scholar 

  8. Gao D W, Peng Y Z, Wang S Y, Liang H. Using ORP and pH value to control treatment of soybean wastewater. Journal of Harbin Institute of Technology, 2003, 35(6): 647–650 (in Chinese)

    CAS  Google Scholar 

  9. Wang S Y, Peng Y Z, Zhou L. The control parameter of SBR process and its reaction time using DO. China Environmental Science, 1998, 18(5): 415–418 (in Chinese)

    CAS  Google Scholar 

  10. Gao J F, Peng Y Z, Wang S Y. Use of pH as fuzzy control parameter for nitrification in SBR process. Chinese Journal of Applied and Environmental Biology, 2003, 9(5): 549–553 (in Chinese)

    CAS  Google Scholar 

  11. Gao J F, Peng Y Z, Wang S Y. Characters of fuzzy control parameters pH and ORP of denitrification in SBR process. Chinese Journal of Environmental Science, 2002, 23(1): 39–44 (in Chinese)

    CAS  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Wang Shuying.

Additional information

Translated from Acta Scientise Circumstantiae, 2006, 26(5): 745–750 [译自: 环境科学学报]

Rights and permissions

Reprints and permissions

About this article

Cite this article

Yang, Q., Wang, S., Yang, A. et al. Advanced nitrogen removal using pilot-scale SBR with intelligent control system built on three layer network. Front.Environ.Sci.Eng.China 1, 33–38 (2007). https://doi.org/10.1007/s11783-007-0006-4

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11783-007-0006-4

Keywords

Navigation