Skip to main content
Log in

Factors driving riverbed scouring and sedimentation in the Bayangaole to Toudaoguai reaches of the Upper Yellow River

  • Published:
Journal of Geographical Sciences Aims and scope Submit manuscript

Abstract

The Inner Mongolia reaches of the Yellow River face problems of severe sedimentation caused by a variety of complex factors. The sedimentation process in those reaches has been characterized using the sediment balance method, and the key factors affecting the process have been analyzed using the correlation analysis method. The results show that during the period 1952–2012 the Bayangaole (Bayan Gol) to Toudaoguai reaches in Inner Mongolia have undergone successive processes of accumulative sedimentation, then relative balance, and then accumulative sedimentation once again. The total annual sedimentation is 12.0341×108 m3, of which accumulations from July to October account for 95.1% and the reaches from Sanhuhekou to Toudaoguai account for 98.5%. The main factor affecting scouring and sedimentation of the Bayangaole to Sanhuhekou reaches is the combined water and sediment condition. The critical conditions for equilibrium are an incoming sediment coefficient < 0.007 kg·s·m–6 and a flow discharge > 700 m3·s–1. The main factor affecting scouring and sedimentation of the Sanhuhekou to Toudaoguai reaches is the incoming sediment from the tributaries on the south bank and the combined water and sediment condition of the main stream. The critical conditions of the main stream for maintaining equilibrium status are a flow discharge of the main stream exceeding 800 m3·s–1 and a comprehensive incoming sediment coefficient < 0.005 kg·s·m–6. The incoming sediment from the tributaries has little impact on the main stream when the annual sediment load is less than 0.1×108 t. The incoming sediment coefficient of the main stream and the incoming sediment from the tributaries both play vital roles in the riverbed evolution of the Inner Mongolia reaches, but the latter contributes the most.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  • Fan X L, Shi C X, Shao W W et al., 2013. The suspended sediment dynamics in the Inner-Mongolia reaches of the upper Yellow River. Catena, 109: 72–82.

    Article  Google Scholar 

  • Fan X L, Shi C X, Zhou Y Y et al., 2012. Sediment rating curves in the Ningxia-Inner Mongolia reaches of the upper Yellow River and their implications. Quaternary International, 282(19): 152–162.

    Article  Google Scholar 

  • Feng G H, Zhang Q Q, 2008. Comprehensive management of Ten Great Gullies and the safety of flood prevention of Inner Mongolia reaches of Yellow River. Soil and Water Conservation in China, 4: 8–10. (in Chinese)

    Google Scholar 

  • Hou S Z, Wang P, Chang W H et al., 2007. Assessment of scouring quantity in Inner Mongolia reaches of Yellow River. Yellow River, 29(4): 21–22. (in Chinese)

    Google Scholar 

  • Hou S Z, Wang P, Gou Y et al., 2014. Response of bankfull discharge of the Inner Mongolia Yellow River to flow and sediment factors. Journal of Earth System Science, 123(6): 1307–1316.

    Article  Google Scholar 

  • Jia X P, Wang H B, Wang H F, 2014. Sources and trace element geochemical characteristics of the coarse sediment in the Ningxia-Inner Mongolia reaches of the Yellow River. Geosciences Journal, 18(2): 181–192.

    Article  Google Scholar 

  • Lin X Z, Guo Y, Hou S Z, 2014. Discussion of estimation method of sediment runoff of Ten Great Gullies of Inner Mongolia. Journal of Sediment Research, 2: 16–21. (in Chinese)

    Google Scholar 

  • Loess Plateau Expedition Team of Lanzhou Desert Institute of Chinese Academy of Sciences, 1988. Estimation of volume of sediment entering into Yellow River of aeolian sand of Shapotou-Hequ reaches. Yellow River, 10(1): 14–19. (in Chinese)

    Google Scholar 

  • Qian N, Zhang R, Zhou Z D, 1987. Fluvial Process. Beijing: Science Press, 343–345. (in Chinese)

    Google Scholar 

  • Qin Y, Zhang X F, Wang F L et al., 2011. Scour and silting evolution and its influencing factors in Inner Mongolian reach of the Yellow River. Journal of Geographical Sciences, 21(6): 1037–1046.

    Article  Google Scholar 

  • Ran L S, Wang S J, Fan X L, 2010. Channel change at Toudaoguai Station and its responses to the operation of upstream reservoirs in the upper Yellow River. Journal of Geographical Sciences, 20(2): 231–247.

    Article  Google Scholar 

  • Shen G Q, Zhang Y F, Hou S Z et al., 2007. Impact of water-sediment adjustment by master stream reservoirs in Upper Yellow River on Ningxia-Inner Mongolia reaches. Journal of Sediment Research, 1: 67–75. (in Chinese)

    Google Scholar 

  • Shi C X, 2010. Analysis of sediment deposition change of Ningxia-Inner Mongolia reaches of Yellow River over the last 500 years. Journal of Sediment Research, 5: 19–25. (in Chinese)

    Google Scholar 

  • Ta W Q, Xiao H L, Dong Z B, 2008. Long-term morphodynamic changes of a desert reach of the Yellow River following upstream large reservoirs’ operation. Geomorphology, 97(3/4): 249–259.

    Article  Google Scholar 

  • Ta W Q, Wang H B, Jia X P, 2011. Downstream fining in contrasting reaches of the sand-bedded Yellow River. Hydrol. Process. 25(24): 3693–3700.

    Article  Google Scholar 

  • Wang P, Hou S Z, Zhang Y F et al., 2013. Characteristics of scouring and sedimentation of high-loaded flood of gullies in Upper Yellow River. Journal of Sediment Research, 1: 67–73. (in Chinese)

    Google Scholar 

  • Wang S J, Fan X L, Zhao X K, 2010. Changes in suspended sediment erosion-accumulation in section of the Yellow River in Ningxia and Inner Mongolia and the influencing factors. Geographical Research, 29(4): 1979–1887. (in Chinese)

    Google Scholar 

  • Wang Y C, Feng X W, Wang L P et al., 1996. Impact of reservoirs in the Upper Yellow River on Inner Mongolia reaches. Yellow River, 18(1): 5–10. (in Chinese)

    Google Scholar 

  • Wu B S, 2008. Delayed response model for alluvial river. J. Hydraul. Eng., 39: 680–687. (in Chinese)

    Google Scholar 

  • Wu B S, Li L Y, 2011. Delayed response model for bankfull discharge predictions in the Yellow River. International Journal of Sediment Research, 26(4): 445–459.

    Article  Google Scholar 

  • Wu B S, Shen G Q, 2008. Discussion of physical significance of incoming sediment coefficient. Yellow River, 30(4): 15–16. (in Chinese)

    Google Scholar 

  • Wu B S, Wang G Q, Xia J Q et al., 2008. Response of bankfull discharge to discharge and sediment load in the Lower Yellow River. Geomorphology, 100(3/4): 366–376.

    Article  Google Scholar 

  • Wu S, Yu L H, 2001. Harm of Xiliugou River flood discharge to Baogang Group and countermeasures. Science and Technology of Baotou Steel (Group) Corporation, 27(S1): 159–161. (in Chinese)

    Google Scholar 

  • Yang G S, Tuo W Q, Dai F N et al., 2003. Impact of sandstorm on channel sediment deposit of Inner Mongolia reaches of Yellow River. Journal of Desert Research, 23(2): 152–159. (in Chinese)

    Google Scholar 

  • Yang Z Y, 1984. Analysis of sediment accumulation to block Yellow River at Zhaojunfen segment of Inner Mongolia in 1961 and 1966. Yellow River, 6: 15–19. (in Chinese)

    Google Scholar 

  • Yao Z Y, Ta W Q, Jia X P et al., 2011. Bank erosion and accretion along the Ningxia-Inner Mongolia reaches of the Yellow River from 1958 to 2008. Geomorphology, 127(1/2): 99–106.

    Article  Google Scholar 

  • Zhao Y A, Shi J Y, 2008. Research on key technology of water-sediment adjustment by master stream reservoirs of Yellow River and the adjustment of operation modes of Longyangxia and Liujiaxia reservoirs. Zhengzhou: Yellow River Institute of Hydraulic Research, Yellow River Conservancy Commission.

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Suzhen Hou.

Additional information

Foundation: National Basic Research Program of China (973 Program), No.2011CB403303; National Science and Technology Support Program during the “12th Five-Year Plan”, No.2012BAB02B03; Basic Research Program of Central Public Research Institutes, No.HKY-JBYW-2014-05

Hou Suzhen (1964–), Professor of Engineering, specialized in river dynamics and riverbed evolution.

Rights and permissions

Reprints and permissions

About this article

Check for updates. Verify currency and authenticity via CrossMark

Cite this article

Hou, S., Wang, P., Guo, Y. et al. Factors driving riverbed scouring and sedimentation in the Bayangaole to Toudaoguai reaches of the Upper Yellow River. J. Geogr. Sci. 26, 1305–1320 (2016). https://doi.org/10.1007/s11442-016-1328-6

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s11442-016-1328-6

Keywords

Navigation