Abstract
The formation regularities of mined-out space in an open pit have been established, and assessment of the mined-out space utilization has been performed for flat-dipping and inclined bedded deposits mined by blocks.
Similar content being viewed by others
References
E. I. Vasil’ev and A. A. Zaitseva, “Computer technology for selection of internal dump and open pit parameters,” Fiz.-Tekh. Probl. Razrab. Polezn. Iskop., No. 5 (2001).
A. A. Zaitseva, “Optimization of the internal dump capacity at an inclined deposit,” Gorn. Inform.-Analit. Byull., No. 5 (2003).
E. I. Vasil’ev, A. A. Zaitseva, and V. I. Cheskidov, “Mining regime stabilization in working inclined deposits by blocks,” Fiz.-Tekh. Probl. Razrab. Polezn. Iskop., No. 6 (1999).
G. G. Poklad, P. S. Shpakov, and V. N. Dolgonosov, “Development of scientific recommendations for the internal dump parameters in the Shubarkol’skiy open pit,” Gorn. Inform.-Analit. Byull., No. 6 (2000).
Author information
Authors and Affiliations
Additional information
__________
Translated from Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh, No. 5, pp. 62–69, September–October, 2007.
Rights and permissions
About this article
Cite this article
Zaitseva, A.A., Cheskidov, V.I. & Zaitsev, G.D. Effect of the mining sequence on the internal dump capacity in an open pit. J Min Sci 43, 508–515 (2007). https://doi.org/10.1007/s10913-007-0053-z
Received:
Issue Date:
DOI: https://doi.org/10.1007/s10913-007-0053-z