A branch-and-bound algorithm for the resource-constrained project scheduling problem

  • Published:
Mathematical Methods of Operations Research Aims and scope Submit manuscript

Abstract.

We describe a time-oriented branch-and-bound algorithm for the resource-constrained project scheduling problem which explores the set of active schedules by enumerating possible activity start times. The algorithm uses constraint-propagation techniques that exploit the temporal and resource constraints of the problem in order to reduce the search space. Computational experiments with large, systematically generated benchmark test sets, ranging in size from thirty to one hundred and twenty activities per problem instance, show that the algorithm scales well and is competitive with other exact solution approaches. The computational results show that the most difficult problems occur when scarce resource supply and the structure of the resource demand cause a problem to be highly disjunctive.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Dorndorf, U., Pesch, E. & Phan-Huy, T. A branch-and-bound algorithm for the resource-constrained project scheduling problem. Mathematical Methods of OR 52, 413–439 (2000). https://doi.org/10.1007/s001860000091

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/s001860000091

Navigation