Skip to main content
Log in

A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation

  • ORIGINAL ARTICLE
  • Published:
The International Journal of Advanced Manufacturing Technology Aims and scope Submit manuscript

Abstract

A hybrid system is constructed in this study for wafer-lot-output time prediction and achievability evaluation, which are critical tasks for a wafer fab (fabrication plant). In the first part of the hybrid system, a look-ahead self-organization map fuzzy-back-propagation network (SOM-FBPN) is constructed to predict the output time of a wafer lot. Compared with traditional approaches in this field, the look-ahead SOM-FBPN has three advanced features: incorporating the future release plan, classifying wafer lots, and incorporating expert opinions. According to experimental results, the prediction accuracy and efficiency of the look-ahead SOM-FBPN were significantly better than those of many existing approaches. In the second part of the hybrid system, a set of fuzzy inference rules (FIRs) are established to evaluate the achievability of an output time forecast, which is defined as the possibility that the fabrication on the wafer lot can be finished in time before the output time forecast. Achievability is as important as accuracy and efficiency but has been ignored in traditional studies. With the proposed methodology, both output time prediction and achievability evaluation can be concurrently accomplished.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Similar content being viewed by others

References

  1. Barman S (1998) The impact of priority rule combinations on lateness and tardiness. IIE Trans 30:495–504

    Article  Google Scholar 

  2. Chandiramani V, Jayaseelan R, Nathan VSL, Priya KS (2004) A neural network approach to process assignment in multiprocessor systems based on the execution time. Proceedings of International Conference on Intelligent Sensing and Information Processing (ICISIP 2004), Chennai, India, January 2004, pp 332–335

  3. Chang P-C, Hsieh J-C (2003) A neural networks approach for due-date assignment in a wafer fabrication factory. Int J Ind Eng 10(1):55–61

    MathSciNet  Google Scholar 

  4. Chang P-C, Hsieh J-C, Liao TW (2001) A case-based reasoning approach for due date assignment in a wafer fabrication factory. Proceedings of the International Conference on Case-Based Reasoning (ICCBR 2001), Vancouver, BC, July 2001

  5. Chang P-C, Hsieh J-C, Liao TW (2005) Evolving fuzzy rules for due-date assignment problem in semiconductor manufacturing factory. J Intell Manuf 16:549–557

    Article  Google Scholar 

  6. Chen T (2003) A fuzzy back propagation network for output time prediction in a wafer fab. J Appl Soft Comput 2/3F:211–222

    Article  Google Scholar 

  7. Chiang J-H (1998) A hybrid neural network model in handwritten word recognition. Neural Netw 11:337–346

    Article  Google Scholar 

  8. Chung S-H, Yang M-H, Cheng C-M (1997) The design of due date assignment model and the determination of flow time control parameters for the wafer fabrication factories. IEEE Trans Compon Packaging Manuf Technol, Part C 20(4):278–287

    Article  Google Scholar 

  9. Foster WR, Gollopy F, Ungar LH (1992) Neural network forecasting of short, noisy time series. Comput Chem Eng 16(4):293–297

    Article  Google Scholar 

  10. Goldberg DE (1989) Genetic algorithms in search, optimization, and machine learning. Addison-Wesley, Reading, MA

    MATH  Google Scholar 

  11. Hung Y-F, Chang C-B (2001) Dispatching rules using flow time predictions for semiconductor wafer fabrications. Proceedings of the 5th Annual International Conference on Industrial Engineering Theory, Applications and Practice, Taiwan, December /2000

  12. Jiang Y, Zhou ZH (2004) SOM ensemble-based image segmentation. Neural Process Lett 20:171–178

    Article  Google Scholar 

  13. Lin C-Y (1996) Shop floor scheduling of semiconductor wafer fabrication using real-time feedback control and prediction. PhD Thesis, Engineering-Industrial Engineering and Operations Research, University of California at Berkeley

  14. Little JDC (1961) A proof of the queuing formula L=λ W. Oper Res 9:383–387

    MATH  MathSciNet  Google Scholar 

  15. Piramuthu S (1991) Theory and methodology: financial credit-risk evaluation with neural and neural fuzzy systems. Eur J Oper Res 112:310–321

    Article  Google Scholar 

  16. Ragatz GL, Mabert VA (1984) A simulation analysis of due date assignment. J Oper Manag 5:27–39

    Article  Google Scholar 

  17. Tiwari MK, Roy D (2002) Minimization of internal shrinkage in casting using synthesis of neural network. Int J Smart Eng Syst Des 4:205–214

    Article  Google Scholar 

  18. Vig MM, Dooley KJ (1991) Dynamic rules for due-date assignment. Int J Prod Res 29(7):1361–1377

    Article  Google Scholar 

  19. Wang L-X, Mendel JM (1992) Generating fuzzy rules by learning from examples. IEEE Trans Syst Man Cybern 22(6):1414–1427

    Article  MathSciNet  Google Scholar 

  20. Weeks JK (1979) A simulation study of predictable due-dates. Manage Sci 25:363–373

    Article  MATH  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Toly Chen.

Rights and permissions

Reprints and permissions

About this article

Cite this article

Chen, T. A hybrid look-ahead SOM-FBPN and FIR system for wafer-lot-output time prediction and achievability evaluation. Int J Adv Manuf Technol 35, 575–586 (2007). https://doi.org/10.1007/s00170-006-0741-x

Download citation

  • Received:

  • Accepted:

  • Published:

  • Issue Date:

  • DOI: https://doi.org/10.1007/s00170-006-0741-x

Keywords

Navigation