The criticality of the time on the refund of the projects. The special case of the concession projects

  • Published:
Operational Research Aims and scope Submit manuscript

Abstract

The project management theory, as it has been developed until now, is based on the triptych time — cost — quality. Given that the project’s quality is not negotiable, the determinant for the project’s efficiency is concerned with the time and the cost, since a possible delay in the construction (time) will result, inter alia (clauses, claims etc.) in a cost’s increase. This increase is a result of the extension of the administrative and fixed payments and the differentiation of the project’s initial budget which is sure to be increased due to the revisions of the materials and services prices. Led by the effort to detect the above mentioned repercussions on the concession projects and based on mathematical equations that use data relative to the constructional and operational cost of transport infrastructure projects, a research has been made on the variation of the ROE (Return on Equity) for different time parameters of the investment.

This is a preview of subscription content, log in via an institution to check access.

Access this article

Price excludes VAT (USA)
Tax calculation will be finalised during checkout.

Instant access to the full article PDF.

Institutional subscriptions

Similar content being viewed by others

References

  • Beranek W. (1963),Analysis of Financial Decisions, Illinois.

  • Christakos K.E. - Kalfakakou G. (2003),Audit Of Viability On Investments Of Motorways Concessions Projects In Association With Dues Of Tolls And The Expected Traffic Circulation On Different Morphology Of The Studied Ground, 16th National Conference HELORS, Larissa.

  • Christakos K.E. - Kalfakakou G. (2003),Variation of Internal Degree of Yields on Concession Projects for Different Percentages of Equity Funds -Bank Lending and Subsidy of Greek State, 16th National Conference HELORS, Larissa.

  • Fransis, Jack Clark, (1972),Analysis and Management, McGrow Hill, New York

    Google Scholar 

  • Lock D (1996).Economic Implications of Multiple Rates of Return in the Leverage Lease Context, Gower

  • Newspaper of Government No 274 (16-12-1996),Concession Of Attica Road, Athens.

  • Renwick Fred (1971),Introduction to Investment and Finance, Macmillan New York

    Google Scholar 

  • TENs HELLAS (2000),Financing Adviser of Greek State, Meeting for the BOT projects, Athens.

  • Walker Anthony (1996),Project Management in Construction, Blackwell Science

  • Weston Fred - Brigham Eugen (1986),Basic Principles of the Financial Management.

  • Wiar, Robert C (1973),Economic Implications of Multiple Rates of Return in the Leverage Lease Context, Journal of Finance, vol. 28, December 1973 OEA. 1275–1286.

    Article  Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Rights and permissions

Reprints and permissions

About this article

Cite this article

Christakos, E.K., Kalfakakou, G. The criticality of the time on the refund of the projects. The special case of the concession projects. Oper Res Int J 6, 27–36 (2006). https://doi.org/10.1007/BF02941136

Download citation

  • Issue Date:

  • DOI: https://doi.org/10.1007/BF02941136

Key Words

Navigation