Abstract
Cycle time reduction is of paramount importance in a manufacturing industry as the customer not only emphasizes on the quality of the product but also takes into consideration the timely delivery of the product. The proposed framework and the advanced methodology in this paper are capable of dealing with each stage of the considered manufacturing unit by maximizing the value of the product through reduction of cycle times and minimization of waste. The time required for all the processes in the manufacturing of the deck rollers is identified and are classified into value added (VA) and non-value added (NVA). Finally, the cycle times were reduced by applying the lean tools and principles on some managerial relevances. Also, Arena software was used to simulate the current and future value stream maps and the change in the cycle times, waiting times, machine utilization, etc. was determined.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Starzyńska, B., Grabowska, M., Hamrol, A.: Effective management of practitioners’ knowledge - development of a system for quality tool selection. In: International Academic Conference on Economic Science and Management Engineering, Guilin, China (2016)
Starzyńska, B., Hamrol, A.: Excellence toolbox: decision support system for quality tools and techniques selection and application. Total Qual. Manag. Bus. Excell. 24(5–6), 577–595 (2013). doi:10.1080/14783363.2012.669557
Sabahudin, J., Diering, M., Brdarevic, S.: Opinions of the consultants and certification houses regarding the quality factors and achieved effects of the introduced quality system. Tehnicki Vjesn. Tech. Gaz. 19(2), 211–220 (2012)
Kujawińska, A., Vogt, K., Wachowiak, F.: Ergonomics as significant factor of sustainable production. In: Golinska, P., Kawa, A. (eds.) Technology Management for Sustainable Production and Logistics, pp. 193–203. Springer, New York (2015)
Diering, M., Hamrol, A., Kujawińska, A.: Measurement system analysis Combined with Shewhart’s Approach. In: Key Engineering Materials, vol. 637, pp 7–11 (2015). ©Trans Tech Publications, Switzerland. doi:10.4028/www.scientific.net/KEM.637.7
Kluczek, A.: Application of multi-criteria approach for sustainability assessment of manufacturing processes. Manage. Prod. Eng. Rev. 7(3), 62–78 (2016). doi:10.1515/mper-2016-0026
Kłos, Sławomir: Implementation of the AHP method in ERP-based decision support systems for a new product development. In: Dregvaite, Giedre, Damasevicius, Robertas (eds.) ICIST 2015. CCIS, vol. 538, pp. 199–207. Springer, Cham (2015). doi:10.1007/978-3-319-24770-0_18
Kłos, Sławomir, Patalas-Maliszewska, Justyna: Throughput analysis of automatic production lines based on simulation methods. In: Jackowski, Konrad, Burduk, Robert, Walkowiak, Krzysztof, Woźniak, Michał, Yin, Hujun (eds.) IDEAL 2015. LNCS, vol. 9375, pp. 181–190. Springer, Cham (2015). doi:10.1007/978-3-319-24834-9_22
Kujawińska, A., Rogalewicz, M., Diering, M.: Application of expectation maximization method for purchase decision-making support in welding branch. Manage. Prod. Eng. Rev. 7(2), 29–33 (2016). doi:10.1515/mper-2016-0014
Kujawinska, A., Rogalewicz, M., Diering, M., Piłacińska, M., Hamrol, A., Kochański, A.: Assessment of ductile iron casting process with the use of the DRSA method. J. Min. Metall. B Metall. 52(1), 25–34 (2016). doi:10.2298/JMMB150806023K
Rogalewicz, M., Sika, R.: Methodologies of knowledge discovery from data and data mining methods in mechanical engineering. Manage. Prod. Eng. Rev. 7(4), 97–108 (2016)
Buń, P.K., Wichniarek, P., Górski, F., Grajewski, D., Zawadzki, P.: Possibilities and determinants of using low-cost devices in virtual education applications. EURASIA J. Math. Sci. Technol. Educ. 13(2), 381–394 (2017). doi:10.12973/eurasia.2017.00622a
Górski, F., Buń, P., Wichniarek, R., Zawadzki, P., Hamrol, A.: Effective design of educational virtual reality applications for medicine using knowledge-engineering techniques. EURASIA J. Math. Sci. Technol. Educ. 13(2), 395–416 (2017). doi:10.12973/eurasia.2017.00623a
Fang, Y.: A method of meta-mechanism combination and replacement based on motion study. Prod. Manufact. Res. 3, 310–323 (2014)
Pulkurte, R., Masilamani, R., Sonpatki, S., Dhake, R.: Cycle time reduction in assembly line through layout improvement, ergonomics analysis and lean principles. Int. J. Appl. Sci. Eng. Res. 3(2), 455–463 (2014)
Gnanavel, S.S., Balasubramanian, V., Narendran, T.T.: An alternative layout to improve productivity and worker well-being in labor demanded lean environment. In: 6th International Conference on Applied Human Factors and Ergonomics and the Affiliated Conferences (2015)
Womack, J.P., Jones, D.T., Roos, D.: The Machine That Changed The World: The Story of Lean Production. Rawson Associates, New York (1990)
Arvind, R., Gunasekaran, N.: A literature review on cycle time reduction in material handling system by value stream mapping. Int. J. Res. Appl. Sci. Eng. Technol. 2, XII (2014)
Seifermann, S., Böllhoff, J., Metternich, J., Bellaghnach, A.: Evaluation of work measurement concepts for a cellular manufacturing reference line to enable low cost automation for lean machining. In: Proceedings of the 47th CIRP Conference on Manufacturing Systems (2014)
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2017 Springer International Publishing AG
About this paper
Cite this paper
Gangala, C., Modi, M., Manupati, V.K., Varela, M.L.R., Machado, J., Trojanowska, J. (2017). Cycle Time Reduction in Deck Roller Assembly Production Unit with Value Stream Mapping Analysis. In: Rocha, Á., Correia, A., Adeli, H., Reis, L., Costanzo, S. (eds) Recent Advances in Information Systems and Technologies. WorldCIST 2017. Advances in Intelligent Systems and Computing, vol 571. Springer, Cham. https://doi.org/10.1007/978-3-319-56541-5_52
Download citation
DOI: https://doi.org/10.1007/978-3-319-56541-5_52
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-319-56540-8
Online ISBN: 978-3-319-56541-5
eBook Packages: EngineeringEngineering (R0)