Skip to main content

Environmental Risk and Decision Analysis

  • Chapter
  • First Online:
Environmental Project Management

Part of the book series: Environmental Science and Engineering ((ENVSCIENCE))

  • 1807 Accesses

Abstract

Environmental risk deals with the probability of an event causing a potentially undesirable effect. Environmental risk assessment thus deals with the statistics (both qualitative and quantitative), because probability is the mathematical measure of risk, and with hazard assessment, which determines the nature of the undesirable effect.

“Kto ni riskuet, tot ni piot champanskoe”; Engl. trans. “He who doesn’t drink never gets to drink champagne”

—An old Russian proverb

This is a preview of subscription content, log in via an institution to check access.

Access this chapter

Chapter
USD 29.95
Price excludes VAT (USA)
  • Available as PDF
  • Read on any device
  • Instant download
  • Own it forever
eBook
USD 119.00
Price excludes VAT (USA)
  • Available as EPUB and PDF
  • Read on any device
  • Instant download
  • Own it forever
Softcover Book
USD 159.99
Price excludes VAT (USA)
  • Compact, lightweight edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info
Hardcover Book
USD 159.99
Price excludes VAT (USA)
  • Durable hardcover edition
  • Dispatched in 3 to 5 business days
  • Free shipping worldwide - see info

Tax calculation will be finalised at checkout

Purchases are for personal use only

Institutional subscriptions

References

  • Beer T, Ziolkowski F (1995) Environmental risk assessment: an Australian perspective, being a supervising scientist report 102 presented at the 1995 Australian academy of science fenner conference on the environment, titled risk and uncertainty in environmental management, held in becker house, Canberra, 13–16 November

    Google Scholar 

  • Borge D (2001) The book of risk. Wiley, New York

    Google Scholar 

  • Cambell John M (2001) Analyzing and managing risky investments, 1st edn. John M. Campbell, Oklahoma

    Google Scholar 

  • Clemen RT (1991) Making hard decisions. PWS-Kent Publishing Company, Boston

    Google Scholar 

  • Damodaran A (2008) Strategic risk taking: a framework for risk management. Wharton School Publishing, Pearson Education, London, 390m p

    Google Scholar 

  • Deel D, Mahajan K, Mahoney C, McIlvried H, Srivastava R (2007) Risk assessment and management for long-term storage of CO2 in geologic formations United States Department of Energy R&D. Syst Cybern Inform 5(1):7984

    Google Scholar 

  • Edwards W (1997) How to use multiattribute utility theory for social decision making. IEEE Trans Syst Man Cybern 7:326–340

    Article  Google Scholar 

  • Gaus I (2010) Role and impact of CO2-rock interactions during CO2 storage in sedimentary rocks. Int J Greenh Gas Control 4:73–89

    Article  Google Scholar 

  • Hall RK (2007) Evaluating resource plays with statistical models. In: SPE hydrocarbon economics and evaluation symposium, Dallas, TX

    Google Scholar 

  • Harding NR (2008) Application of stochastic prospect analysis for shale gas reservoirs. In: Paper presented at the 2008 SPE Russian oil and gas technical conference and exhibition held in Moscow, Russia, 28–30 October

    Google Scholar 

  • Havranek TJ (1999) Modern project management techniques for the environmental remediation industry. CRC Press, Boca Raton, 456 p

    Google Scholar 

  • Hesse MA, Orr FM, Tchelepi HA (2008) Gravity currents with residual trapping. J Fluid Mech 611:35–60

    Article  Google Scholar 

  • IPCC (2005) In: Metz B, Davidson O, Meyer L, de Coninck HC (eds) Intergovernmental panel on climate change (IPCC). Special report on carbon dioxide capture and storage. Cambridge University Press, Cambridge

    Google Scholar 

  • Juanes R, Spiteri EJ, Orr FM Jr, Blunt MJ (2006) Impact of relative permeability hysteresis on geological \(CO_2\) storage. Water Resour Res 42:W12418

    Article  Google Scholar 

  • Kahneman D, Tversky A (1979) Prospect theory: an analysis of decision under risk. Econometrica 47:263–291

    Article  Google Scholar 

  • Kamenetzky R (1982) The relationship between the analytic hierarchy process and the additive value function. Decis Sci 13:702–716

    Article  Google Scholar 

  • Kaplan S, Garrick B (1981) On the quantitative definition of risk. Risk Anal I:1–27

    Google Scholar 

  • Kodukula P, Papudesu C (2006) Project valuation using real options: a practitioner’s guide. J. Ross Publishing, Plantation, 256 p

    Google Scholar 

  • Milosevic DZ (2003) Project management toolbox: tools and techniques for the practicing project manager. Wiley, New York, 584 p

    Google Scholar 

  • Mun J (2012) Real options analysis: tools and techniques for valuing strategic investments and decisions, 2nd edn. Wiley, New York, 704 p

    Google Scholar 

  • Newendorp P (1975) Decision analysis for petroleum exploration. Petroleum Publishing Co., Tulsa, p 187

    Google Scholar 

  • Power M, McCarty LS (1998) A comparative analysis of environmental risk assessment/risk management frameworks. Environ Sci Technol 32(9):224A–231A

    Article  Google Scholar 

  • Riaz A, Hesse M, Tchelepi HA, Orr FM (2006) Onset of convection in a gravitationally unstable diffusive boundary layer in porous media. J Fluid Mech 548:87–111

    Article  Google Scholar 

  • Schuler John R (2001) Risk and decision analysis in projects. Project Management Institute, USA

    Google Scholar 

  • Schulmerich M (2008) Real options valuation the importance of interest rate modelling in theory and practice, 2nd edn. Springer, Berlin, 389 p

    Google Scholar 

  • Soong TT (2004) Fundamentals of Probability and Statistics for Engineers, John Wiley and Sons, 391 p

    Google Scholar 

  • Standards Australia (2006) HB 203:2006: environmental risk management principles and process. SAI Global, Sydney

    Google Scholar 

  • von Winterfelt D, Edwards W (1986) Decision analysis and behavioral research. Cambridge University Press, Cambridge, 604 p

    Google Scholar 

  • Wakeman JB (2003) RE: decision analysis. In: Email to Igor Linkov, dated April 4, 2003. Includes attachment a: decision analysis based upon implementability of the action alternatives at Milltown Dam

    Google Scholar 

Download references

Author information

Authors and Affiliations

Authors

Corresponding author

Correspondence to Ebenezer A. Sholarin .

Rights and permissions

Reprints and permissions

Copyright information

© 2015 Springer International Publishing Switzerland

About this chapter

Cite this chapter

Sholarin, E.A., Awange, J.L. (2015). Environmental Risk and Decision Analysis. In: Environmental Project Management. Environmental Science and Engineering(). Springer, Cham. https://doi.org/10.1007/978-3-319-27651-9_7

Download citation

Publish with us

Policies and ethics